SERVICING
Health and Safety Statement :
This Heater contains no asbestos.
Routine Service
To ensure continued efficient operation of the
appliance it is recommended that it is checked and
serviced at regular intervals.
The frequency of servicing will depend upon the
particular installation and usage but in general every
2000 hours of operation should be the maximum.
It is law that any service work should be carried out
by Corgi registered personnel.
1.
Clean burner and combustion chamber.
2.
Check condition of ignition spark and sensing
probe.
3.
Check boiler pipework joints for leaks.
4.
Check the Air duct and Flue seals.
5.
Check condensate syphon and pipework for leaks.
6.
Check the Gas Rate.
7.
Check the combustion CO and CO2.
8.
Reset the Service Hours counter in the control.
Follow the procedures given in Changing Components
for parts removal in addition to the following notes.
In all cases, before work commences turn off the
Mains Electrictity and Gas Supply.
Burner & Combustion Chamber
To view the burner and the inside of the Heat
Exchanger it is suggested you remove the front of
the Heat Exchanger complete with the Fan and Gas
Valve:
Remove Door and Front Top Panel
Disconnect Gascock flange form Valve.
Unplug Fan electrical connectors.
Remove Air tube from Flue Adapter.
Undo cover over Ignition Control connections
and remove the two connectors.
Pull off the Earth Lead connection on the
Valve and Heat Exchanger.
Undo the four nuts holding the Heat Exchanger
front and withdraw.
Assembly is the reverse.
Reset the Service Hours Counter. (
See Service
Mode, page 22
)
Spark & Sense Electrode
Turn off the Heater.
Pull off the HT Lead.
Undo the two screws retaining the electrode
assembly and carefully withdraw.
The spark gap should be 3.0 mm ± 0.5.
(See Fig 12.0)
Assembly is the reverse, ensure the gasket
is correctly placed.
Pipework
IMPORTANT
. The Heat Exchanger connections
are made using O rings and should not be strained
in any direction. Any strain will result in damage to
the Heat Exchanger and will not be covered by the
warranty.
All plastic pipework joints are solvent welded and
cannot be remade but have to be replaced.
Condensate Syphon
The lower bowl of the Syphon can be unscrewed,
examined and cleaned.
Air Duct & Flue Seals
A visual inspection should establish there are no
leaks around any of the seals, including the flexible
Air Duct to the Venturi.
Gas Rate & Combustion
See the Datatable on Page 1 for the correct val-
ues.
A Combustion sample point is provided on the front
of the Flue Adapter. (
See Fig.14.1
)
Changing Components
THERE IS ONE FUSE, THE REMAINDER OF
THE CONTROLS ARE NOT REPAIRABLE AND
IF NOT WORKING MUST BE REPLACED.
In all cases, before work commences turn off the
Mains Electricity and Gas Supply.
The following items can be replaced:
Fuse, 24V supply.
Transformer.
Pool Thermostat.
Condensate Pressure Switch.
Relay.
Pool Temperature Sensor.
Heat Exchanger Flow Sensor.
Water Pressure Switch.
Control Thermostat.
Overheat Thermostat.
Condensing Pool Heater
25
22/12/08
Fig 12.0
Summary of Contents for MB35S
Page 24: ...Fig 11 0 Condensing Pool Heater 21 22 12 08 Schematic Wiring ...
Page 33: ...Condensing Pool Heater 30 22 12 08 This page has been intentionally left blank ...
Page 34: ...Condensing Pool Heater 31 22 12 08 This page has been intentionally left blank ...
Page 36: ...Station Lane Industrial Estate Witney Oxon Tel 01993 778855 Fax 01993 703407 22 12 08 ...