Consider all cabling requirements and routing as in Figure 9. (
IM
page
14)
3
4
C
ABLING
R
EQUIREMENTS
O
PERATOR
I
NSTALLATION
Figure 1 Gate Opening Angle Diagram
o
110
o
120
o
100
o
90
o
80
o
70
o
60
(Gate opening angle)
o
0
Check for the safety and suitability of the site by looking at: (
IM
page
13)
All safety and local authority requirements.
That the gate is within the operator specifications.
Check that there is enough ground clearance to enable assembly
of the drivearm clamps. (See Figure 4)
Estimate the gate swing angle with figure 1.
Then mark the operator’s position according to figure 2 or 3.
(IM
page 15
)
Check that you have all the tools required. (
IM
page 12)
2
1
R
EQUIRED
T
OOLS
& E
QUIPMENT
S
ITE
C
ONSIDERATIONS