* Increase cable thickness if pillar lights are to be installed.
† Screened cable is always recommended to provide better protection against lightning - earth one end
of screening.
CABLE REQUIREMENTS
1.
220V AC mains cable (3 core LNE
2
0,5mm )*†, via mains isolator switch
Or
Low voltage 16V AC battery charger
2
supply (2 core 1,5mm )†.
2.
Intercom cable (n1 + 6 core) to
house.
3.
Slave motor cable (if required) (3
2
2
core 2,5mm + 3 core 0,5mm
multistranded).
2
4.
Radio receiver cable (3 core 0,5mm
multistranded).
5.
Pedestrian key switch (if required) (2
2
core 0,5mm multistranded).
6.
Infrared beams or safety edge (if
2
required) (3 core 0,5mm
multistranded)
2
7.
Intercom cable (n2+2 core 0,5mm
multistranded) to gate station.
n1 = number of cores required by intercom.
n2 = number of cores required by intercom.
2
S
ET
UP
THE
G
ATE
O
RIGIN
Release the manual override and close the gate(s).
Use the origin tool and line up marks as in figure 10.
(IM
page 28
)
Open gate ½ way and
unscrew
the manual release mechanism.
(IM
page 28).
Figure 10 Origin Setup
Setup Tool
Manual Release
Mechanism
S
ETTING
THE
G
ATE
O
RIGIN