Ensure that the M10 gearbox
mounting bolts are properly
tightened
Cable conduits must be installed
before pouring the concrete (see
next section)
2. Assemble foundation plate with anchor
brackets as shown.
Option 1: Concrete foundation
page 18
Foundation plate installation
1. The foundation plate can either be set into a concrete foundation, as in Figure 11 or
bolted down onto an existing concrete plinth as in Figure 13.
When using a concrete foundation
it is recommended that the
foundation plate is welded to the
rail/track of the gate using short
length of flat bar, as in Figure 12.
This makes it possible to complete
the whole mechanical and
electrical installation, without
having to wait for the concrete to
set. After completing the
installation the concrete can be
poured and the operator left in the
manual mode until the concrete
has set
FIGURE 12
Gate
rail
Foundation
plate
Flat bar welded to
foundation plate
and rail
FIGURE 11
400mm
300mm
400mm
M10
gearbox
mounting
bolts