5 Commissioning the system
Commissioning the photovoltaic system is part of the ex-
pert and proper construction and installation. This may
only be carried out following a careful visual examination
and a professional electrical inspection. A record should
also be prepared on commissioning the system.
Bear in mind the following checklist when commissioning
the system:
Visual examination
P
P
Bolting the components on the roof construction
P
P
Cable installation on modules, generator connection
boxes DC disconnection points, inverters
P
P
Potential equalization (if available)
Electrical examination
P
P
String open-circuit voltages
P
P
String short-circuit currents (use load break switch)
P
P
PV generator open-circuit voltage
P
P
Voltage drop in fuses (with PV installations with string
fuses)
P
P
Insulation resistance of the PV generator
P
P
Insulation resistance of the direct current main lines
P
P
Insulation resistance of the alternating current line
P
P
Loop resistance of the alternating current circuit
Record
P
P
Declaration by the installation operator
P
P
Location of the installation
P
P
Technical details on the photovoltaic installation
P
P
Results of the visual examination
P
P
Results of the electrical examination
P
P
Module layout plan
P
P
Module interconnection plan
P
P
Ready signal by signature of the fitter
Please observe
This list is only for your information. It is not necessarily
complete.
Please also observe DIN EN 62446 (VDE 0126-23): Net
-
work coupled PV systems - minimum demands of system
documentation, commissioning inspection and repeat
tests,
Summary of Contents for CENPAC 3 Series
Page 1: ...www centrosolar com www centrosolar co uk CENPAC Mounting instructions CENPAC 3 x CENPAC 5 x...
Page 2: ......
Page 4: ...4...
Page 22: ...Notes 22...
Page 23: ......