![Centrometal PelTec 12-48 Technical Instructions Download Page 55](http://html1.mh-extra.com/html/centrometal/peltec-12-48/peltec-12-48_technical-instructions_2582740055.webp)
Chimney sweeper
5.
3
. Chimney sweeper
Chimney sweeper
Time
1.
2.
Power
3.
The factory set temperature that must be achieved to start measuring (except for conditions that
can be changed - boiler power and time)
.
- the minimum boiler temperature
: min. 60°C
Factory: 600 sec
Minimum: 600 sec
Maximum: 3600 sec
After the set parameters are met there is min. time to stabilize the flame before measuring. This
time begins to run when the boiler is on selected power Dx and minimum boiler temperature
.
After the expiration of this time the text of the counter becomes green (1) and only then is
allowed to start measuring.
5.3.2 TIME
Possible selection:
80°C
120°C
0%
1700
15k
30%
60°C
05:08
OFF
00:00:00
O2=8%
Technical instructions REGULATION
PelTec / PelTec-lambda
55