Connection to the central heating system and the start up have to be performed according
all technical standards, on behalf of the authorized person which assumes the responsibility for
proper functioning of Your boiler.
Connections to the central heating system have to be performed by application of proper
fittings and not by welding. Integration into open and close central heating systems is possible.
2.1. CONNECTION TO THE CENTRAL HEATING SYSTEM
2.0. INSTALLATION
All local regulations, including those referring to national and European standards need to be
complied with when installing the appliance.
Installation, connection to the central heating system