![Cembre CPE-0-P12N Operation And Maintenance Manual Download Page 5](http://html.mh-extra.com/html/cembre/cpe-0-p12n/cpe-0-p12n_operation-and-maintenance-manual_2581274005.webp)
ENGLISH
2.3) Body
The body of the pump comprises:
– Base
(03) made from sheet metal, treated and finished with epoxy powder paint; slotted
to allow natural air convection, fitted with four robust nylon feet and supporting the motor/
pump and electrical equipment.
– Motor and pump unit
(04) and 05), supplied at 12 V.D.C., complete with solenoid valve
(EV) for controlling the oil delivery, pressure switch (P), safety valve, oil filler cap (11) for
topping up or replacing the oil, drain plug for oil removal, oil delivery pipe fitted with quick
release female coupler (09).
– Battery 12 V- 10 Ah
(02 and 22), sealed type, rechargeable, maintenance free, complete
with cable lead and modular plug, for connection to the Printed Circuit Board.
– Control card
(17) Printed Circuit Board Assembly; containing the electronic control
systems. The electric motor and other ancillary equipment is connected to the PCB by
modular connectors.
– Integral
Battery charger
, supplied at 220-240V, for recharging the internal battery
in function of the ambient temperature.
3. INSTRUCTION FOR USE
(Ref. to Fig. 1)
3.1) Setting up
– Fit the hand control lead plug (15) to the appropriate socket (39) on the control panel.
Secure the plug using the integral locking ring.
– Check the high pressure hose (13). If abrasions are evident, or if the hose is kinked or
damaged, do not use.; connect its end fitted with a quick release automatically locking
female coupling connector to the corresponding male connector on the hydraulic head,
and its end fitted with male coupling connector to the corresponding female connector
(09) on the pump.
3.2) Operation
– Push the button on the hand control (16) to activate the motor and pump oil to the hydraulic
head.
The following led’s will light up on the “control panel”:
green led (
100%
) indicating “Battery 100% charged”
green led ( ) indicating “Pump motor in operation”
–
The pump will stop automatically when the nominal operating pressure is achieved.
The pressure of the oil will be maintained.
On the “control panel” the green led ( ) indicating “Pump motor in operation” will go out.
By releasing the hand control push-button, the oil pressure will be released.
On the “control panel” the green led (
100%
) indicating the state of charge of the battery will go
out and simultaneously the yellow led ( ) indicating “Pressure released” will switch on and
remain on for about 15 seconds.
➝
➝
➝
➝
➝
➝
39
4
P
EV
MOTOR
MOTEUR
MOTOR
MOTOR
MOTORE
HYDRAULIC PUMP
POMPE HYDRAULIQUE
HYDRAULISCHE PUMPE
BOMBA HIDRAULICA
POMPA IDRAULICA
C
ONTROL CARD
CARTE CONTROLE
STEUERUNGSKARTE
TARJETA DE MANDO
SCHEDA DI COMANDO
4
5
6
7
8
9
–19
+18
14
15
16
17
22
23
2
3
4
5
6 / 7
8 / 9
+10 / +11
30
–12 / –13
TR
22
23
+18
–19
14
15
16
17
+10
+11
–12
–13
30
➟
➟
➟
➟
➟
➟
➟
–
+
+24
–25
➟
BATTERY
BATTERIE
AKKU
BATERIA
BATTERIA
FIG. 3 WIRING DIAGRAM - SCHEMA DE CABALAGE - SCHEMA ELEKTRISCHE VERBINDUNGEN -
ESQUEMA DE CABLEADO - SCHEMA COLLEGAMENTI