
20
Perform a Digestion
Turntable Setup
1.
If applicable, load the control vessel in the "Control Vessel" or "1" position of the turntable.
1.1.
If the control vessel has pressure control, connect the ESP-1500+ pressure connector and tighten
until finger tight. If the ESP-1500+ pressure option is not available, tighten the nut until finger tight.
1.2.
If the control vessel has fiber optic temperature control, insert the fiber optic probe into the control
vessel.
• The fiber optic probe should slide easily into the thermowell through the frame screw and load disc
until the probe reaches the bottom of the thermowell.
• Do not force the fiber optic probe.
• If probe cannot be easily inserted, check vessel alignment. Loosen the screw and realign.