www.cellarcool.com | Page 11
PREPARING THE INSTALLATION LOCATION
Minimum Tools Needed
Hammer
Saw
Drill with 1/4” Nut Driver Bit
Level
Note:
The following installation examples are for reference only, door header construction and framing may
vary. When not installing above a door, adequate framing inside of the wall is necessary. CellarCool recommends
consulting a licensed contractor for framing and construction needs.
Locate the desired installation location, using a level and a pencil
mark a center line.
Mark the center line for your desired installation location, followed by
laying out the hole for the unit.
* Hole size: 22 1/2 inches by 10 3/4 inches
Cut out the drywall and studs for the unit opening.
Warning:
Use caution not to cut through any electrical or plumbing.
In most cases framing will need to be added to provide adequate
support for the unit and mounting bracket.
Door Opening
22 1/2”
10 3/4”
*minimum 1” from door casing
*minimum 4” from ceiling
Center Line
Summary of Contents for SL Series
Page 1: ......