www.cellarcool.com | Page 5
Receiving and Inspecting the Unit
•
Lift only at the designated handhold locations on the shipping container or fully support the unit from under-
neath. A shipment may include one or more boxes containing accessories.
•
Before opening the container, inspect the packaging for any obvious signs of damage or mishandling.
•
Write any discrepancy or visual damage on the Bill of Lading before signing.
•
Place the box containing the CellarCool unit on a tabletop to prepare it for testing prior to installing.
•
Sit upright for 24 hours.
Note:
CellarCool units are manufactured in the USA and tested prior to shipment.
Review the Packing Slip to Verify Contents
•
Check the model number to ensure it is correct.
•
Check that all factory options ordered are listed.
If any items listed on the packing slip do not match your order information, contact CellarCool Customer Service im-
mediately.
Check the Box for the following contents:
Mounting Brackets (2)
Accessory Kit One:
•
CellarCool SL2500 Owner’s Manual
Accessory Kit Two:
•
1/2” Self-Tapping Screws (4)
•
1 3/4” Hex Head Screws (4)
•
Drain Line tube with Brass Connector
•
Insulation Foam Strips (4)
Please leave the CellarCool unit in its original box until you are ready for installation, this will allow you to move the
product safely without damaging it.
TIP:
Save your box and all packaging materials. They provide the only safe means of transporting/shipping the unit.
RECEIVING & INSPECTING THE UNIT
Summary of Contents for SL Series
Page 1: ......