Step 37: Attach Elbow Assembly to Flange Assembly
Part 2
Note: When installing Pan Bolts make sure to look at holes so bolts
go through the side with the round recess and the lock nuts go
through the side with the hexagonal recess. Keep all bolts loose until
further step.
C:
Attach 1 TNR2 Slide Clamp Ring to the bottom of the joined Assemblies
using 2 (PB1) 1/4 x 3/4” Pan Bolts (with lock nut) on one side and 1 (PB1)
1/4 x 3/4” Pan Bolt (with lock nut) in the other side, making sure to match
the arrows up with the end of the clamp ring (where a seam will be) as
shown in fig. 37.5, 37.6 and 37.7.
D:
Connect the 2 TNR2 Slide Clamp Rings together in 2 spots using 1
(PB1) 1/4 x 3/4” Pan Bolt (with lock nut) per hole. Make sure seams and
arrows line up and then tighten all bolts. (fig. 37.8 and 37.9).
Hardware
5 x
1/4 x 3/4” Pan Bolt
(1/4” lock nut)
PB1
Other Parts
1 x TNR2 Slide Clamp Ring
DO NOT USE
USE IMAGE
DO NOT USE
USE IMAGE
DO NOT USE
USE IMAGE
Fig. 37.6
Bottom Slide Bolt Holes
Fig. 37.8
Fig. 37.9
Fig. 37.7
Fig. 37.5
Make sure
arrows are
aligned
After the clamp rings
are attached to the
elbows, fasten them
end to end with two
pan bolts and lock nuts
PB1
Lock
Nut
PB1
(Side not shown)
PB1
Lock
Nut
Lock
Nut
80
Summary of Contents for Abbeydale Clubhouse F23920
Page 90: ...NOTES 90 support cedarsummit com ...
Page 91: ...NOTES ...