CE+T Power TSI Bravo User Manual Download Page 44

18. maintenance

maintenance shall only be performed by properly trained people.

18.1  Access T2S with lap top

„

„

Download system log fIlE and save 
- Analyze log file and correct errors

„

„

Download system ConfIguRATIon fIlE and save 
- Check/correct configuration file according to operation conditions  
- Check/correct alarm configuration

„

„

Check module internal temperature for deviation between modules 
- Temperature deviation may indicate build up of dust. Clean with compressed air

„

„

Check module/system load 

„

„

Check/Correct inverter mapping (DC group/AC group/ Address)

„

„

Change configuration file to validate that system operates on both supply sources

„

„

Check outgoing alarm, consult configuration file what actions will generate alarm

18.2  manual check

„

„

validate input voltage (AC input, DC input, AC output) with multi-meter

„

„

Replace dust filter

„

„

Take a snap shot of the cabinet

18.3  optional

„

„

With an infrared camera check termination hot spots 
- Tighten terminations

18.4  manual by-pass 

„

„

If mains failure during operation the load is lost

„

„

perform a manual by-pass operation

44 

– TSI Bravo – user manual – v7.0

Summary of Contents for TSI Bravo

Page 1: ...S a Rue du Charbonnage 12 B 4020 Wandre Belgium www cet power com info cet power com Dual Input Inverter The Commercial Power as default source AC backup in a DC environment Leverage your existing DC...

Page 2: ...5 3 1 Miniature circuit breakers 13 5 3 2 MCCB 13 6 Monitoring accessories 14 6 1 Can Dis shelf 14 6 1 1 Display 14 6 1 2 TCP IP Agent 14 7 System Design 15 7 1 Pack A la Carte 15 7 1 1 Pack 15 7 1 2...

Page 3: ...1 Connection Table DC Input 110VDC X1 29 9 4 12 Connection Table DC Input 220VDC X1 30 9 4 13 Signalling 30 10 Interface 32 10 1 Inverter module 32 10 2 T2S 32 11 System set up 33 11 1 Communication s...

Page 4: ...1 Access T2S with lap top 44 18 2 Manual check 44 18 3 Optional 44 18 4 Manual by pass 44 19 Defective modules 45 20 Appendix 46 20 1 Cabinet foot print layout 46 20 2 Single phase circuit diagram 47...

Page 5: ...ion REG Regular DSP Digital Signal Processor AC Alternating current DC Direct current ESD Electro Static Discharge MET Main Earth Terminal MBP Manual By pass TCP IP Transmission Control Protocol Inter...

Page 6: ...onal safety standards N output and PE shall be bonded EPC system that have no AC input wired and connected to comply with local and international safety standards N output and PE shall be bonded The b...

Page 7: ...ar inverter system shall be fitted with suitable Lightning surge suppression and Transient voltage surge suppression for the application at hand Manufacturer s recommendations of installation shall be...

Page 8: ...sineoidal output The BOOST functionality enables 10x Inom for a period of 20ms in the event of down stream failures The upstream breakers does not have to be oversized to prevent tripping The overloa...

Page 9: ...et relay and is only connected when down stream clearance is required boost or DC is unavailable The transfer between DC and AC result in transfer time typical 10ms 3 4 REG mode Inverter modules carry...

Page 10: ...run in single phase or three phase configurations The inverter modules is equipped with soft start Fan is equipped with alarm and run time meter The fan is field replaceable 435 D x 102 W x 88 H 5 Kg...

Page 11: ...s max 32 inverters in one bus The T2S provides Alarm monitoring Record the latest 200 events Fi Fo 3 outgoing alarms 2 digital input MOD bus CAN bus USB front connector In depth read the TxS manual xx...

Page 12: ...rates via manually operated switches that create a by pass from mains input via output AC distribution Inverter modules are by passed and possible to remove without impacting the load When in by pass...

Page 13: ...Max current per AC DU is 200A max current per terminal connector is 50A Two adjacent terminal connectors shall be used for 63A breakers If alarm is required for AC output breakers a held contact atta...

Page 14: ...oom for 1 3 display units and 1 TCP IP agent 6 1 1 Display Backlit 2 line dot matrix The display show two values simultaneous 6 1 2 TCP IP Agent The TCP IP interface board is mounted on the CanDis she...

Page 15: ...s The system comprises cabinet inverter sub rack inverter modules 24VD to 220VDC manual by pass monitor device and AC output distribution The A la Carte is available as EPC Enhanced Power Conversion o...

Page 16: ...onfigured per phase 1 A R phase 2 B S and phase 3 C T These are not interchangeable Make sure that modules from one phase are not mixed with modules from another phase 8 1 Mounting kit Bravo PACK or S...

Page 17: ...ve markings for all terminations All cables shall be rated at Min 90 deg C Electrical terminations shall be tightened with 1 2 1 5Nm All connection screws are M5 x 12mm DC Input Individual per module...

Page 18: ...have a working lightning surge suppression device in service Indoor sites Min Class II Outdoor sites Min Class I Class II or combined Class I II 8 2 3 Terminations All terminations are clearly marked...

Page 19: ...3x6mm2 M5 1 5Nm Bravo pack Double shelf 3x16mm2 24VDC 3x6mm2 48VDC to 220VDC 3x10mm2 8 2 8 Signalling Relay characteristics Selectable Major Minor Switching power 60W Rating 2A at 30VDC 1A at 60VDC M...

Page 20: ...OFF The remote ON OFF can be connected to any shelf The remote ON OFF requires changeover contacts one input opens as the other close If both transitions are not picked up the status is not changed R...

Page 21: ...tallation to keep them out of harms way The internal bus is connected from the first shelf to the last shelf 8 2 11 Rear cover The rear cover provides IP 20 to the rear terminations when required The...

Page 22: ...t and raise the cabinet on location 9 3 Fixing the cabinet to the floor The cabinet is fixed through the base of the cabinet Remove lowest front cover to gain access to the fixing holes Max screw diam...

Page 23: ...e cables with nylon tie straps AC Output distribution X4 Ground PE DC Input X1 AC Input X2 Alarm X3 X5 X6 AC Output X4 DC Input X1 AC input X2 Alarm X3 Digital in X5 Remote ON OFF X6 Bulk AC output X4...

Page 24: ...local regulations Min 16mm2 9 4 4 AC Input X2 The AC input is wired to a screw terminal Max cable area is 180mm2 9 4 4 1 Single phase L N PE 9 4 4 2 Three phase NOTE The three phase input is 123 ABC...

Page 25: ...rnal DC distribution with circuit breakers Q01 Q32 per inverter module Max 8x240mm2 per pole 9 4 5 2 2 DC Input 2x Common DC input per system Note Screws and nuts are not included in the delivery M10...

Page 26: ...DC distribution with circuit breakers Q01 Q32 per inverter module Max 2x240mm2 per pole 9 4 5 4 Individual input Individual DC input per module shelf and common return Note Screws and nuts are not in...

Page 27: ...5A 50 30 160A 70 36 200A 95 36 3x63A 3x16 42 225A 150 45 3x80A 3x25 48 250A 150 9 4 7 Connection Table AC Input X2 48VDC to 220VDC The AC input supply breaker shall be 2p for single phase and min 3p f...

Page 28: ...A 2x600A 30 1500A 36 1700A 2x800A 3x600A 36 42 2000A 45 2200A 2x1200A 3x800A 48 2300A 9 4 9 Connection Table DC Input 48VDC X1 Power kVA DC Input Bulk DC Input 2 Common DC Input 3 Common DC Input indi...

Page 29: ...750A 2x400A 50 1000A 60 1100A 2x600A 3x400A 60 70 1300A 75 1400A 3x500A 80 1500A 2x750A 9 4 11 Connection Table DC Input 110VDC X1 Power kVA DC Input Bulk DC Input 2 Common DC Input 3 Common DC Input...

Page 30: ...minal cable lug 1ph 3ph Fuse CB Cable Fuse CB Cable Fuse CB Cable Fuse CB Cable mm2 10 63A 16A 2 5mm2 Live Screw terminal Common Cable lug M5 2 5Nm torque 20 120A 2x60A 30 160A 3x60A 30 40 220A 2x500A...

Page 31: ...onnected to any shelf The remote ON OFF requires changeover contacts one input opens as the other close If both transitions are not picked up the status is not changed Digital input characteristics Re...

Page 32: ...fault Permanent red Non recoverable fault Send module back for repair Output Power redundancy not counted 5 5 to 40 40 to 70 80 to 95 100 100 overload Output Power redundancy not counted Status output...

Page 33: ...driver CET_T2S inf installed on laptop Available for download at http www acbackuptsi com Username T322010000 Password No password required enter Read T2S manual for detailed setup 11 1 Communication...

Page 34: ...splay 0 Return to previous menu 1 14 Page number selection 16 Clear log 17 Save log to a file 6 Module errors information 0 Return to preceding menu 1 32 detailled Modules errors 3 System actions sele...

Page 35: ...ff when opening the handle The handle only fixes the module to the shelf Use a screw driver to release the latch of the handle Open the handle Pull the module out Replace with new module or blind unit...

Page 36: ...Fan failure can result from failing fan or driver circuit Let the module rest at least 5 minutes prior to initiating work The inverter front must be removed Use a blunt tool to depress the latches on...

Page 37: ...2 Clip breaker on to the DIN rail 3 Insert Insulated screw driver in the terminal to load the spring 4 Insert connection cable and remove screw driver 5 Connect load cable to breaker Neutral and Groun...

Page 38: ...network and output inverter voltage setting To reduce the overload impact the inverter power and current will be reduced from 150 to nominal value The by pass switch disconnect all AC voltage on the s...

Page 39: ...y pass 1 S1 0 1 2 S2 1 0 3 S3 1 0 4 DC OFF 14 5 2 By pass to Normal 1 DC ON 2 S3 0 1 3 PAUSE wait until the inverter modules have come to full operation 30 60 seconds 4 S2 0 1 5 S3 1 0 0 1 39 TSI Brav...

Page 40: ...re that all cables are strained relived Make sure that all breakers are according to recommendation and local regulations Make sure that DC polarity is according to marking Re tighten all electrical t...

Page 41: ...to have all module operating when running on DC and have module failure when AC input recover from fault condition Installation and commissioning must be done and conducted by trained people fully aut...

Page 42: ...rding to the site LVD load on AC AC threshold level Switch OFF ACin and check if system is working on DC Switch ON ACin and check if system correctly transferred load on AC Switch OFF system and start...

Page 43: ...k threshold level Inverter only run on AC or DC Check the configuration and setting Check threshold level No output power Check output breaker All OK but I have alarm Check configuration file and corr...

Page 44: ...st Clean with compressed air Check module system load Check Correct inverter mapping DC group AC group Address Change configuration file to validate that system operates on both supply sources Check o...

Page 45: ...e requested through the http my cet power com extranet Repair registering guidelines may be requested by email at repair cet power com The RMA number should be mentioned on all shipping documents rela...

Page 46: ...20 Appendix 20 1 Cabinet foot print layout 46 TSI Bravo User manual v7 0...

Page 47: ...2 21 65 64 63 62 61 60 59 58 57 56 55 51 52 53 54 49 50 SEO32457 M REGNIER 21 10 2008 S D ANGELO J BOZZER SYSTEM TSI BRAVO EPC 230VAC 3 8 RACKS MONO OPTIONAL DC DISTRIBUTION OPTIONAL Michel REGNIER Si...

Page 48: ...RE T l 04 3456700 Fax 04 3456701 Rue du charbonnage nr 18 Zoning Industriel TELECOMMUNICATIONS CONSTRUCTIONS ELECTRONIQUES Sheet Number Nr DATE MODIF OPTIONAL SYSTEM TSI BRAVO EPC 230VAC 80KVA INDIVID...

Page 49: ...20 4 Mains connection Single phase TN S 400 230VAC L1 L2 L3 N PE PEN L3 L2 L1 TN C 400 230VAC PE L3 L2 L1 TN C S 400 230VAC N PEN TT 400 230VAC L1 L2 L3 N 49 TSI Bravo User manual v7 0...

Page 50: ...20 5 Mains connection Three phases PE N L3 L2 L1 TN S 400 230VAC TN C 400 230VAC L1 L2 L3 PEN N L3 L2 L1 TT 400 230VAC TN C S 400 230VAC L1 L2 L3 N PE PEN 50 TSI Bravo User manual v7 0...

Page 51: ......

Reviews: