![CE+T Power BRAVO ST-120 VAC-UL User Manual Download Page 32](http://html1.mh-extra.com/html/ce-t-power/bravo-st-120-vac-ul/bravo-st-120-vac-ul_user-manual_2577178032.webp)
11. Final check
•
Make sure that the sub-rack/cabinet is properly fixed to the cabinet/floor
•
Make sure that the sub-rack/cabinet is connected to Ground.
•
Make sure that all DC and AC input breakers are switched OFF.
•
Make sure that all cables are sized according to recommendations and local regulations.
•
Make sure that all cables have strain relieved.
•
Make sure that all breakers are sized according to recommendation and local regulations.
•
Make sure that DC polarity is according to marking.
•
Torque all electrical terminations according to recommendation and local regulations.
•
Make sure that no inverter/controller bays are left open.
•
Cover empty inverter bays with dummy cover.
•
Make sure that the Remote ON/OFF is appropriately wired according to local regulations, if used.
•
Make sure that the point of AC supply meets local regulations.
Final check
32
- Bravo ST 120 Vac - 2+1 Redundancy - User Manual - v1.0
Summary of Contents for BRAVO ST-120 VAC-UL
Page 38: ......