CD Automation srl
REVO S
User’s Manual
CD-Eng-REVO-S-2PH-280-700A-Solid-State-Relay
6
2
Basic Connections and sizing
Star wiring with resistive load (control on two phases with REVO M-2PH)
V
P
I
73
1
,
V = Nominal voltage of the load
I = Nominal current of the load
P = Nominal power of the load
V
I
Delta wiring with resistive load (control on two phases with REVO M-2PH)
V
P
I
73
1
,
V = Nominal voltage of the load
I = Nominal current of the load
P = Nominal power of the load
V
I