10
4 Installation Guide
4.1 Preparations
1) Basic Requirements
All the electric work must be finished under the latest electric & fire prevention
law and rules (and any related law and rules). Please check according to the
packing list if every accessory is included. And also make sure the installation is
operated as required. Please contact us for any help during the installation.
2) Installation Space and Density Checkup
Please make sure the space is big enough to install our dome. And also ensure
the density of the ceilings or walls to hold total weight of the dome and its
accessories.
3) Cables Preparation
Please choose the proper cable according to the transmission distance. The min
requirement of coaxial BNC cable is listed as follows for reference:
4) Setup Dip Switch for Dome Address
*Please turn to Part 5 for details.
Models
Max Distance
Feet
\
Meter
RG59/U
750ft(229m)
RG6//U
1,000ft(305m)
RG11/U
1,500ft(457m)
(
)