RRS-2 Technical Manual iii
© 2010 CBS ArcSafe™
Table of Contents
1.0 Description .................................................................................................................2
1.1 Components .................................................................................................................... 2
1.1.1 Structural Assembly ............................................................................................................... 2
1.1.2 Control Assembly ................................................................................................................... 7
1.1.3 Tooling Assembly ................................................................................................................... 7
2.0 Controls and Indications ..............................................................................................8
3.0 Preparation and Operation ....................................................................................... 10
3.1 Set up Training .............................................................................................................. 10
3.2 Unpacking the RRS-2 ..................................................................................................... 11
3.3 Charging the RRS-2 ........................................................................................................ 12
3.4 Setting the Actuator Limit Switches.............................................................................. 13
3.5 Setting up the RRS-2 for Operation .............................................................................. 14
3.6 Current Control Module (CCM) Configuration ............................................................. 15
3.6.1 Manual Current Control Configuration ................................................................................ 15
3.6.2 Automatic Current Control Configuration ........................................................................... 17
3.6.2 Automatic Current Control Time Stop Configuration .......................................................... 19
4.0 Operation ................................................................................................................. 20
4.1 Circuit Breaker Installation ........................................................................................... 20
4.1.1 Requirements for Installation .............................................................................................. 20
4.1.2 Steps for Installation ............................................................................................................ 20
4.2 Circuit Breaker Removal ............................................................................................... 21
4.2.1 Requirements for Removal .................................................................................................. 21
4.2.2 Steps for Removal ................................................................................................................ 21
5.0 Maintenance ............................................................................................................. 22
5.1 Introduction .................................................................................................................. 22
5.2 Prior to Use ................................................................................................................... 22
5.3 After Use ....................................................................................................................... 22
5.4 Every 12 to 18 Months .................................................................................................. 22
6.0 Ordering Replacement Parts ..................................................................................... 23