3
P
remise
CHECKS wITH THE FAN STATIONARy ................................................. 15
Checking the distance between the impeller and nozzle (air gap) ................................. 16
CHECKS wITH THE FAN RUNNING ....................................................... 17
Fan flow rate and partialisation of the flow.
.................................................................... 17
ATEX MAINTENANCE REqUIREMENTS ............................................... 20
SCHEDULED MAINTENANCE ................................................................. 20
OBLIGATIONS AND LIABILITy ............................................................... 21
Summary of Contents for CH Series
Page 23: ...22 Table Work performed Item Pos Type of job and or Notes Date Operator signa ture Annexes ...
Page 24: ...23 Table Work performed Item Pos Type of job and or Notes Date Operator signa ture Annexes ...
Page 25: ...24 Table Work performed Item Pos Type of job and or Notes Date Operator signa ture Annexes ...