
STEP 7
Assembly Process:
This is a very important step in your build. Here you will soldier the open leads from the ESC's to the PDB. Take your time
and plan this out. Wire management is very important. Provide enough slack on each ESC wire lead so it doesn't rub up
against the main frame plate. But, not too much excess slack as to result in a messy build! If your wires are too long you
may find it difficult to install the rest of the components later in the build. Since you are soldiering the ESC leads with the
PDB installed it helps greatly to use a soldier gun with a fine tip. BE CAREFUL not to get too close to the plastic FC
standoffs or you may damage them with your soldier gun. At this step you can also cut down the ESC signal leads that
run to your flight controller (black and white wires in the picture below). This is important, because most ESC's come
with signal leads that are too long resulting in excess wire. Test fit your FC and determine how long you want these
signal leads to be. Cut then re-soldier the leads to reduce their length.
Summary of Contents for 180-R
Page 2: ...SECTION 01 BILL OF MATERIAL...
Page 5: ...SECTION 02 REQUIRED TOOLS...
Page 7: ...SECTION 03 BUILD PREPARATION...
Page 9: ...SECTION 4 ASSEMBLY PROCESS...
Page 11: ......
Page 12: ......
Page 13: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 19: ......
Page 20: ......
Page 22: ......
Page 24: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 52: ......
Page 53: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ...SECTION 5 HD CAMERA MOUNT INSTALL OPTIONAL...
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ...SECTION 6 LIPO INSTALLATION...
Page 74: ......