35
2
.
Air connection
:
as Fig.2
,
connect tube C with D (the middle connector), the other side of tube is connected with
one way valve.
10.5.Operation
1
.
When
After tire is mounted, there is much space left between the rim and the tire as Fig.3, when normal inflating is not
workable, quick tire inflating is needed.
Much space left between
rim and
tire
Fig. 3
2
.
How
As
Fig.4-a
,
Let the mouth close to the edge of rim, hold valve body
F
by right hand, hold valve bush
E
by left
hand and push
E
as arrow direction, and you can hear “POP”, the groove is quickly inflated with high pressure air
from the tank, the rim and tire close touched as
Fig.4-b
, then normal tire inflating operation.
Fig. 4
NOTE
:
Please wear eye-glasses, ear-plugs and other personal protective equipment, when operating this
device
10.6.Maintenance
1
.
Regular check safe valve if it is normally working as
Fig.5-a
, when it reach at normal working air pressure
in the tank, hold needle
A
in the safe valve and pull it upward, and you can hear voice of deflation, it suggests the
Summary of Contents for CASC506
Page 14: ...13 Fig 21 Fig 22 Fig 23...
Page 25: ...24 9 Exploded drawings 9 1 Column assembly Fig 34...
Page 26: ...25 9 2 Turntable assembly Fig 35...
Page 27: ...26 9 3 Gearbox motor assembly Fig 36...
Page 28: ...27 9 4 Body assembly Fig 37...
Page 29: ...28 9 5 Pedal Assembly Fig 38...
Page 30: ...29 9 6 Bead Breaker Cylinder Breaker Arm Assembly Fig 39...
Page 31: ...30 Appendix 1 Electrical Diagram Fig 41 Fig 42...
Page 33: ...32 Appendix 3 Drawing of installation for small package Fig 44...
Page 38: ...37 10 8 Exploded drawings...
Page 50: ......