CHAPTER 6 - MAINTENANCE AND ADJUSTMENTS
6-3
6-34551NA
Issued 8-04 Bur
TRACKS
MAINTENANCE SPECIFICATIONS
Clean .......................................................................... Periodically and when the machine has been working in mud
Check tension ............................................................................................................................................Periodically
Check steel pad screw torques.............................Every 250 hours (after the first 50 hours during the run-in period)
Check the rubber track pads (optional)........................................................................... Every 10 hours or every day
IMPORTANT: If the tracks are too tight, they wear
quickly. If tracks are not tight enough, they wear
quickly and the links can catch on the sprocket wheel
or slide off the idler wheel or the sprocket wheel.
Clean the tracks after work.
IMPORTANT: For rubber tracks (Optional), avoid
pivoting on the spot as this could cause the tracks to
wear out quickly and could also cause jamming of
stones, rocks, etc. Avoid working in an area full of
rock rubble or debris, pieces of reinforced concrete or
striated plates.
CLEANING
When the machine has been working in mud, a
reduction in temperature can cause the mud to
solidify.
1. Place the upperstructure at right angles to the
undercarriage. Use the attachment to press on
the ground and lower the boom until the track is
raised off the ground.
CT02D176
Figure 1
2. Put the engine throttle button (1) on the
maximum speed position and select the fast
speed (2).
CT02D156
Figure 2
3. Operate the travel control lever for the raised
track forwards and then in reverse, to remove the
mud.
4. Repeat Steps 1 to 4 for the other track.
NOTE: For machines fitted with the dozer blade, the
machine can be lifted by completely lowering the
blade and by using the attachment as a support on
the ground, opposite the blade.
CT02C063
Figure 3
CHECKING THE TENSION
1. Park the machine on flat, horizontal ground.
2. Clean the tracks.
3. Place the upperstructure at right angles to the
undercarriage. Use the attachment to press on
the ground and lower the boom until the track is
raised off the ground.
1
2
Summary of Contents for CX135SR
Page 6: ...IV Issued 8 04 Bur 6 34551NA CHAPTER 9 INDEX...
Page 12: ...CHAPTER 1 GENERAL INFORMATION 1 6 Issued 8 04 Bur 6 34551NA NOTES...
Page 14: ...CHAPTER 2 SAFETY DECALS AND HAND SIGNALS 2 2 Issued 8 04 Bur 6 34551NA NOTES...
Page 60: ...CHAPTER 3 INSTRUMENTS AND CONTROLS 3 32 Issued 8 04 Bur 6 34551NA...
Page 62: ...CHAPTER 4 OPERATING INSTRUCTIONS 4 2 Issued 8 04 Bur 6 34551NA...
Page 82: ...CHAPTER 4 OPERATING INSTRUCTIONS 4 22 Issued 8 04 Bur 6 34551NA NOTES...
Page 132: ...CHAPTER 5 LUBRICATION FILTERS AND FLUIDS 5 50 Issued 8 04 Bur 6 34551NA NOTES...
Page 134: ...CHAPTER 6 MAINTENANCE AND ADJUSTMENTS 6 2 Issued 8 04 Bur 6 34551NA...
Page 152: ...CHAPTER 6 MAINTENANCE AND ADJUSTMENTS 6 20 Issued 8 04 Bur 6 34551NA NOTES...
Page 154: ...CHAPTER 7 ELECTRICAL 7 2 Issued 8 04 Bur 6 34551NA NOTES...
Page 164: ...CHAPTER 8 SPECIFICATIONS 8 2 Issued 8 04 Bur 6 34551NA...
Page 183: ...CHAPTER 8 SPECIFICATIONS 8 21 6 34551NA Issued 8 04 Bur NOTES...
Page 184: ...CHAPTER 8 SPECIFICATIONS 8 22 Issued 8 04 Bur 6 34551NA...