3
Prepare Hoses
A
Determine hose lengths required for hydraulic
supply configuration of truck.
B
Cut hoses to length, install end fittings.
NSTALLATION
I
CL0589.ill
CL0585.ill
Sideshifting – Double Hose Reels
Sideshifting – Double Internal Hose Reeving
Sideshifting with Solenoid – IHR and Cable Reel
Sideshifting with Solenoid – 6-N-1 Cable/Hose Reel
Open
Sideshift Left
Sideshift Right
Clamp
CL0588.ill
CL0586.ill
SSL / Open
(TANK port)
SSR / Clamp
(PRESSURE Port)
Flush hydraulic supply hoses
A
Install hoses using union fittings.
B
Operate auxiliary valves for 30 sec.
C
Remove union
fittings.
4
GA0092.ill
Non-Sideshifting – Single Hose Reel
CL0587.ill
Clamp
Open
Solenoid
Cable
IMPORTANT:
Attachment hydraulic lines can be
plumbed to either side of the dual-ported main valve if
required, to match existing truck supply configurations.
3
Summary of Contents for E Series
Page 13: ......