91
|
P a g e
cascadesciences.com
|
Tel. 503 847-9047
OPERATION
P
RE
-O
PERATION
S
AFETY
V
ERIFICATIONS
Prior to providing power or gas to the oven, the operator should verify the following.
1.
Verify the oven is safe to put into operation. Check the documentation service file if restoring
the oven to operation after a repair or other service. The file should indicate the oven was tested
by a qualified service technician and is safe to put into operation.
2.
Verify the vacuum and gas ports on the oven are either connected to a vacuum or gas supply
line or are capped. This helps prevent the workspace atmosphere from entering the oven chamber
when powered and heated.
3.
Verify and log the highest temperature to be run during the setup or baking application.
4.
Verify any hazardous substance that will be placed in the oven during a baking application
belongs to an allowed hazardous material group. This includes substances used to treat products or
samples.
5.
Check which gas supply is designated in the process SOP for backfilling the oven chamber.
•
The Vent valve control on the oven panel uses the Purge and Pressurize gas supply to
backfill the chamber.
•
The Backfill valve control flows gas from the Backfill gas-in port on the back oven to
backfill the chamber.
6.
Verify the
Vacuum
,
Vent
, and
Backfill
valve controls on the oven control panel are in the
closed position. If the oven has a side-mounted vacuum control valve, that valve must also be in
the closed position.
S
UPPLY
G
AS TO THE
P
URGE AND
P
RESSURIZE
S
YSTEM
Supply a flow of gas to the oven before supplying power.
Note:
The exact order of operation of
the following steps depends on your regulator type and gas system configuration.
•
Set the Purge and Pressurize gas supply regulator to provide
4.2 cubic feet per minute
(117.5 normal liters per minute)
of gas flow to the oven.
•
Start a flow of gas to the Purge and Pressurize Gas-In Port.
Summary of Contents for CVO-5-EX Series
Page 1: ...Flammable Solvent Ovens Installation Operation Manual CVO 5 EX Oven Series...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 Special Conditions Of Use 131...
Page 7: ...7 P a g e cascadesciences com Tel 503 847 9047 TABLE OF CONTENTS...
Page 11: ...11 P a g e cascadesciences com Tel 503 847 9047 SAFETY CERTS AND STATEMENTS...
Page 17: ...17 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Page 22: ...22 P a g e cascadesciences com Tel 503 847 9047...
Page 24: ...24 P a g e cascadesciences com Tel 503 847 9047 These groups include propane and n butane...
Page 29: ...29 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 37: ...37 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION...
Page 39: ...39 P a g e cascadesciences com Tel 503 847 9047...
Page 44: ...44 P a g e cascadesciences com Tel 503 847 9047 RECEIVING...
Page 51: ...51 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 54: ...54 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 61: ...61 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 65: ...65 P a g e cascadesciences com Tel 503 847 9047 INSTALLATION...
Page 67: ...67 P a g e cascadesciences com Tel 503 847 9047 SYMBOLS...
Page 69: ...69 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 72: ...72 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 95: ...95 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 104: ...104 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 116: ...116 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 123: ...123 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 125: ...125 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 127: ...127 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 128: ...128 P a g e cascadesciences com Tel 503 847 9047 MAINTENANCE...
Page 130: ...130 P a g e cascadesciences com Tel 503 847 9047 REPLACEMENT PARTS...
Page 132: ......