A
1
2
3
6
11
English
7 EN
9. Daily Switch-On
Preliminary operations
Check that the coffee beans receptacle (
2
) is correctly
positioned on the grinder-doser. Lift the lid (
1
) and
¿
ll with
coffee beans. Check that the gate (
3
) is open, pulling it
towards the outside.
The grinder only works when the ring nut (A)
has been completely tightened.
WARNING: this appliance is provided with
delayed “ON/OFF” automatic device
Switching on – general instructions
“Ensure that the mains switch is on before switching
on the appliance.”
Automatic Grinder-Doser
Turn the appliance on by turning switch (
11
) to “1”.
This appliance has an automatic cut-off switch that
intervenes every time the doser (
6
) has suf
¿
cient ground
coffee. If switch (
11
) is left on position “1” the grinder-doser
will start automatically every time the level of ground coffee
needs to be
¿
lled up.
At the end of the working day, switch off the appliance by
turning the general switch (
11
) to “0”.
On Demand Grinder-Doser
Turn the appliance on by turning switch (
11
) to “1”.
In the On Demand version, when the grinder has been
switched on, the display (
10
) shows the time set for the
coffee dose (single and double) and a bar indicates the
coffee granulometry with related reference value.
At the end of the working day, switch off the appliance by
turning the general switch (
11
) to “0”.
USE
OPEN
CLOSED
ON DEMAND VERSION
Grinding
time –
single
coffee
dose
Coffee
granulometry
Reference
value
Grinding
time –
double
coffee
dose
02Enea_MULTI.indd 7
18/09/2014 15:42:27
Summary of Contents for Enea
Page 2: ...00Enea indd 2 18 09 2014 15 41 22 ...
Page 10: ...VIII VIII 01Enea indd 8 18 09 2014 15 41 41 ...
Page 83: ...IX IX 08Enea indd 9 18 09 2014 15 41 50 ...
Page 85: ......
Page 86: ......