- 4 -
INSTALLATION & CONNECTION
Installation
INDIC
ATOR
LEVELING G
AUGE
How to install the BW-series
1. Open the box with
care because indicator is
c
onne
cted to the
sc
ale with load cell wire
.
2. Turn the post knob so
as to fix
indicator
.
3.
Pull down the wire out
of
post
pipe
a
nd inser
t
the post
p
ipe to the
pos
t bracket.
(Refer to fig. 1)
4. Fasten the pos
t pipe with
two bolts. (R
efer to fig. 1)
A long bolt should be conn
ected to the up
per side.
5. Insert the wire to the
post pipe. (
R
efer
to fig. 2.3)
6. If the scale is not pr
operly level,
please adjust
4 leg(adjusting
bolt) at the bott
om of
the sc
ale
s
o
as to center the bu
bble
of the le
veling ga
uge
Note: Place the s
cale on a flat a
nd s
table
surface.
inside the
indicated circle.
FIG.
3
ADJUST
FIG
. 2
WIRE
FIG
. 1
POST
BRACKET
PLATFORM
PO
ST KNOB
POST PIPE
POST BR
ACKET
LOAD CEL
L WIRE
BOLT
POST PIPE
Summary of Contents for BW-SERIES
Page 1: ... 1 BATTERY WEIGHING SCALE BW SERIES SERVICE MANUAL Revision 2005 5 9 ...
Page 10: ... 10 SCHEMATIC DIAGRAM ...
Page 11: ... 11 P C B DIAGRAM MAIN PCB BOTTOMSIDE TOP SIDE ...
Page 12: ... 12 DISPLAY PCB BOTTOM SIDE TOP SIDE ...
Page 13: ... 13 CONNECTION DIAGRAM ...
Page 20: ... 20 BODY ASS Y LOW CAPACITY CAPACITY 30kg 15kg 6kg SPACE mm 2 4 3 8 1 35 ...
Page 21: ... 21 SET C T BOX ASS Y LOW CAPACITY ...
Page 22: ... 22 BODY ASS Y HIGH CAPACITY ...