5. Connect the flexible tube on the sampling inlet to the sam-
pling tube on the basepan.
6. For units with an economizer, the sampling tube is inte-
grated into the economizer housing but connecting the
flexible tubing to the sampling tube is the same.
Fig. 54 — Return Air Smoke Detector Module
Shipping Position
Fig. 55 — Return Air Sensor Operating Position
FIOP Smoke Detector Wiring and Response
ALL UNITS
The FIOP smoke detector is configured to automatically shut
down all unit operations when a smoke condition is detected.
See Fig. 56, Smoke Detector Wiring.
HIGHLIGHT A
JMP 3 is factory-cut, transferring unit control to smoke detector.
HIGHLIGHT B
Smoke detector NC contact set will open on smoke alarm con-
dition, de-energizing the ORN conductor.
HIGHLIGHT C
24-v power signal using the ORN lead is removed at the smoke
detector input on CTB; all unit operations cease immediately.
PREMIERLINK™ AND RTU-OPEN CONTROLS
Unit operating functions (fan, cooling and heating) are termi-
nated as described above. In addition:
HIGHLIGHT D
On smoke alarm condition, the smoke detector NO Alarm con-
tact will close, supplying 24-v power to GRA conductor.
HIGHLIGHT E
GRA lead at Smoke Alarm input on CTB provides 24-v signal
to FIOP DDC control.
PREMIERLINK
This signal is conveyed to PremierLink FIOP’s TB1 at terminal
TB1-6 (BLU lead). This signal initiates the FSD sequence by
the PremierLink control. FSD status is reported to connected
CCN network.
RTU-OPEN
The 24-v signal is conveyed to RTU-OPEN-J1-10 input termi-
nal. This signal initiates the FSD sequence by the RTU-OPEN
control. FSD status is reported to connected BAS network.
USING REMOTE LOGIC
Five conductors are provided for field use (see Highlight F in
Fig. 56) for additional annunciation functions.
ADDITIONAL APPLICATION DATA
Refer to
Factory-Installed Smoke Detectors for Small and Me-
dium Rooftop Units 2 to 25 Tons
for discussions on additional
control features of these smoke detectors including multiple
unit coordination. See Fig. 56.
SENSOR AND CONTROLLER TESTS
Sensor Alarm Test
The sensor alarm test checks a sensor’s ability to signal an
alarm state. This test requires the use of a field provided SD-
MAG test magnet.
SENSOR ALARM TEST PROCEDURE
1. Hold the test magnet where indicated on the side of the
sensor housing for seven seconds.
2. Verify that the sensor’s Alarm LED turns on.
3. Reset the sensor by holding the test magnet against the
sensor housing for two seconds.
4. Verify that the sensor’s Alarm LED turns off.
Controller Alarm Test
The controller alarm test checks the controller’s ability to initi-
ate and indicate an alarm state.
CONTROLLER ALARM TEST PROCEDURE
1. Press the controller’s test/reset switch for seven seconds.
2. Verify that the controller’s Alarm LED turns on.
3. Reset the sensor by pressing the test/reset switch for two
seconds.
4. Verify that the controller’s Alarm LED turns off.
SAMPLE TUBE
SCREWS
FLEXIBLE EXHAUST
TUBES
RETURN AIR SENSOR
(Operating Position Shown)
SCREWS (2)
SAMPLE TUBE
CONTROLLER
MODULE
IMPORTANT: Failure to follow this ALERT can result
in an unnecessary evacuation of the facility.
This test places the duct detector into the alarm state.
Unless part of the test, disconnect all auxiliary equipment
from the controller before performing the test. If the duct
detector is connected to a fire alarm system, notify the
proper authorities before performing the test.
Summary of Contents for WeatherMaster 50HC04
Page 32: ...32 Fig 63 RTU Open Overlay for Economizer Wiring ...
Page 33: ...33 Fig 64 VFD Overlay for W2770 Controller Wiring ...
Page 86: ...86 Fig C 50HC A07 PAC Control Diagram 208 230 3 60 460 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Page 91: ...91 Fig H 50HC D12 PAC Control Diagram 208 230 3 60 460 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Page 93: ...93 Fig J 50HC A04 A06 PAC Power Diagram 208 230 1 60 APPENDIX D WIRING DIAGRAMS ...
Page 95: ...95 Fig L 50HC A07 PAC Power Diagram 208 230 3 60 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Page 100: ...100 Fig Q 50HC D11 PAC Power Diagram 208 230 3 60 APPENDIX D WIRING DIAGRAMS ...
Page 101: ...101 Fig R 50HC D11 PAC Power Diagram 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Page 103: ...103 Fig T 50HC D14 PAC Power Diagram 208 230 3 60 APPENDIX D WIRING DIAGRAMS ...
Page 104: ...104 Fig U 50HC D14 PAC Power Diagram 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Page 124: ...124 Fig AO PremierLink System A04 A06 Wiring Diagram APPENDIX D WIRING DIAGRAMS ...
Page 125: ...125 Fig AP RTU Open System Control A04 A06 Wiring Diagram APPENDIX D WIRING DIAGRAMS ...
Page 126: ...126 Fig AQ PremierLink System A07 D14 Wiring Diagram APPENDIX D WIRING DIAGRAMS ...
Page 127: ...127 Fig AR RTU Open A07 D14 Wiring Diagram APPENDIX D WIRING DIAGRAMS ...