Form 50HC-7-12-07SI
Pg CL-1
11-18
Replaces: 50HC-7-12-06SI
START-UP CHECKLIST FOR 50HC07-12 SINGLE PACKAGE ROOFTOP
COOLING ONLY
(REMOVE AND USE FOR JOB FILE)
I. PRELIMINARY INFORMATION
MODEL NO. ____________________________________________
JOB NAME _____________________________________________
SERIAL NO. ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
L1-L2_____________
L2-L3_____________
L3-L1_____________
Compressor Amps 1
L1 _____________
L2 _____________
L3 _____________
Compressor Amps 2
L1 _____________
L2 _____________
L3 _____________
Supply Fan Amps
L1 _____________
L2 _____________
L3 _____________
TEMPERATURES
Outdoor-air Temperature
_____________ °F DB (Dry Bulb)
Return-air Temperature
_____________ °F DB
_____________
°
F Wb (Wet Bulb)
Cooling Supply Air Temperature
_____________ °F
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preced-
ing sections of this Installation Instruction document.
Summary of Contents for WeatherMaster 50HC*A07 Series
Page 4: ...4 Fig 2 Unit Dimensional Drawing Sizes 07 09 ...
Page 5: ...5 Fig 2 Unit Dimensional Drawing Sizes 07 09 cont ...
Page 6: ...6 Fig 3 Unit Dimensional Drawing Sizes 11 and 12 ...
Page 7: ...7 Fig 3 Unit Dimensional Drawing Sizes 11 and 12 cont ...
Page 25: ...25 Fig 42 Electro Mechanical Control Wiring Diagram ...
Page 26: ...26 Fig 43 Electro Mechanical Control Wiring Diagram with Humidi MiZer System ...
Page 27: ...27 Fig 44 Typical ComfortLink Control Wiring Diagram 50HC 08 09 shown ...
Page 29: ...29 Fig 46 Typical PremierLink Control Wiring Diagram ...
Page 30: ...30 Fig 47 Typical PremierLink Control Wiring Diagram with Humidi MiZer System Option ...
Page 31: ...31 Fig 48 Typical RTU Open Controller Wiring Diagram ...
Page 32: ...32 Fig 49 Typical RTU Open Controller Wiring Diagram with Humidi MiZer System Option ...