RGAP(A,B)XX: Installation and User Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
4
4. Determine the proper height of L-bracket supports and threaded
hole locations, with truss geometry utilizing 2" x 4" or 2" x 6"
trusses.
5. Attach L-brackets to the outer cabinet (
). Choose the proper
location for two L-brackets per side (out of four possible locations
on each side) based on truss geometry.
6. Use additional screws from the accessory bag to plug any mounting
holes that are not in use.
A200495
Fig. 5 – L-Bracket Supports and Threaded Holes
7. Lift the unit into the rough-in location, resting on the L-bracket
supports (
).
8. Verify proper positioning of the air cleaner, then secure the
L-brackets to the truss using ¼" wood screws provided by installer.
A200496
Fig. 6 – Position Unit and Secure L-Brackets
9. Finish mounting with twelve ¼" wood screws through holes on all
four sides of the cabinet from inside of the unit into the trusses and
blocks (
).
A200497
Fig. 7 – Secure with Inner Mounting Screws
10. Unscrew the two screws retaining the cover of the electrical box
mounted on the top of the air purifier, remove the cover, and punch
out the desired electrical box knockout.
11. Electrical Connections (
,
, and
):
NOTE:
Use proper strain relief when installing wiring to junction box.
a. For
Furnace
Units—Connect wiring from the EAC terminals to
a unit disconnect switch in the attic, and then connect the wiring
from the disconnect to the electrical box on the unit, using a
proper UL rated fitting at the electrical box knockout on the unit.
Follow standard wiring configuration: Black = high voltage;
White = neutral; Green = ground.
b. For
Fan Coil
Units—Connect wiring from the transformer using
the quick connect kit to the unit disconnect switch in the attic,
and then connect the wiring from the disconnect to the electrical
box on the unit, using a proper UL rated fitting at the electrical
box knockout on the unit. Follow standard wiring configuration:
Black = high voltage; White = neutral; Green = ground.
12. Reattach the electrical box cover. See
for further
wiring details.
A200498
Fig. 8 – Connect Wiring to Unit
13. Install return air ductwork to the top of the RGAPA unit and seal
the opening (
).
A200499
Fig. 9 – Install Return Air Ductwork
THREADED HOLE LOCATIONS
2” x 4” TRUSS APPLICATION
2” x 6” TRUSS APPLICATION
THREADED HOLE LOCATIONS
WARNING
!
ELECTRIC SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
For proper operation and safety, the unit MUST have an uninterrupted
ground circuit according to national and local codes.
115 VAC
WIRING
CONNECTIONS