START-UP CHECKLIST
(REMOVE AND STORE IN JOB FILE)
I. PRELIMINARY INFORMATION
MODEL NO. ____________________________________________
JOB NAME _____________________________________________
SERIAL NO. ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that jobsite voltage agrees with voltage listed on rating plate (Y/N) _____
Verify that all packaging materials have been removed from unit (Y/N) _____
Remove all shipping hold-down bolts and brackets per installation instructions (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Check refrigerant piping for indications of leaks; investigate and repair if necessary (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor-air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that electrical wiring is not in contact with refrigerant lines or sharp metal edges (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify installation of thermostat (Y/N) ______
III. START-UP
ELECTRICAL
Supply Voltage
L1-L2_____________
L2-L3_____________
L3-L1_____________
Compressor Amps 1
L1 _____________
L2 _____________
L3 _____________
Compressor Amps 2
L1 _____________
L2 _____________
L3 _____________
Indoor Fan Amps
L1 _____________
L2 _____________
L3 _____________
TEMPERATURES
Outdoor-air Temperature
_____________ °F DB (Dry Bulb)
Return-air Temperature
_____________ °F DB
_____________
°
F WB (Wet Bulb)
Cooling Supply Air Temperature
_____________ °F DB
_____________
°
F WB (Wet Bulb)
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preced-
ing sections of this Installation Instruction document.
Summary of Contents for Puron R-410A
Page 29: ...29 Fig 44 RTU Open Overlay for Economizer Wiring ...
Page 30: ...30 Fig 45 VFD Overlay for W2770 Controller Wiring ...
Page 50: ...50 Fig 63 50KC Typical Unit Wiring Diagram Power 06A 208 230 3 60 ...
Page 51: ...51 Fig 64 50KC Unit Wiring Diagram Control A06 ...
Page 77: ...77 Fig C Unit Wiring Diagram Power for Sizes A04 and A06 208 230 1 60 ...
Page 78: ...78 Fig D Unit Wiring Diagram Power for Size A05 208 230 1 60 ...
Page 79: ...79 Fig E Unit Wiring Diagram Power for Sizes A04 A06 208 230 3 60 460 3 60 575 3 60 ...