Installing the Zone Ctrl II and VAV Zone II Secondary Duct into the i-Vu® application
Zone Ctrl II and
VAV Zone II Secondary Duct Installation and Start-up Guide
CARRIER CORPORATION ©2019
Error! No text of specified style in document.
30
All rights reserved
Dual duct control programs using the Zone Ctrl II and a VAV Zone II Secondary Duct
•
Constant Volume Dual Duct (Cold Deck and Hot Deck Airflow Sensing)
•
Constant Volume Dual Duct (Cold Deck and Total Airflow Sensing)
To create your control program in EquipmentBuilder
1
Start EquipmentBuilder. (Windows
Start
>
All Programs
>
i-Vu Tools x.x
)
2
Click
Create Equipment
and then click
Next
.
3
Select the ivu-x.x-universal-controller.sal library from the
Library:
drop-down
list.
4
Select the equipment type from the list and click
Next
.
5
In the
Equipment Name
field, edit the name, if desired.
NOTE
Your name must not exceed 21 characters.
6
Select options on the
Summary
tab and, if applicable, edit setpoints on the
Sequence
tab.
NOTE
The
Points
and
Sequence
tabs change based on your choices on the
Summary
tab.
7
Click
Next
.
8
Check the files you wish to generate from the list.
9
Check to select saving your control program files to a folder of your choice or a folder linked to a system.
10
Click
Next
.
To edit an existing control program in EquipmentBuilder
1
Start
EquipmentBuilder
. (Windows
Start
>
All Programs
>
i-Vu Tools x.x
)
2
Click
Open Equipment
and browse to the .equipment file that you want to edit. and click
Open
.
NOTE
○
If using i-Vu® Standard or Plus, you must first save your control program to your computer from the i-
Vu® interface, using the right-click
Configure
window.
○
If using i-Vu® Pro, navigate to the webroot/<system>/programs folder.
3
In the
Equipment Name
field, edit the name, if desired.
NOTE
Your name must not exceed 21 characters.
4
Select options on the
Summary
tab and ,if applicable, edit setpoints on the
Sequence
tab.
NOTE
The
Points
and
Sequence
tabs change based on your choices on the
Summary
tab.
5
Click
Next
.
6
Check the files you wish to generate from the list.
7
Check to select saving your control program files to a folder of your choice or a folder linked to a system.
8
Click
Next
.
See i-Vu® Help for instructions on how to apply your new or edited control programs to controllers in your system.