Installing the Zone Ctrl II and VAV Zone II Secondary Duct into the i-Vu® application
Zone Ctrl II and
VAV Zone II Secondary Duct Installation and Start-up Guide
CARRIER CORPORATION ©2019
Error! No text of specified style in document.
28
All rights reserved
You must complete the following procedures to successfully install your Zone Ctrl II and VAV Zone II Secondary
Duct into the i-Vu® application. Use the Help in the referenced software for detailed descriptions of these
procedures.
EquipmentBuilder or Snap
1
Use EquipmentBuilder or Snap to create control program(s).
2
If applicable, print the Sequence of Operation, which includes the points list.
NOTE
You can create a points list under
Reports
in the i-Vu® application or Field Assistant after installing
your control program.
This Installation Guide
1
Prepare a wire list using the points list. Refer to
Appendix A
(page 48).
2
Use the wire list and the following installation procedures to install and wire I/O points to your Zone Ctrl II
The i-Vu® or Field Assistant application
1
Upload the controller to the database by selecting the router in the navigation tree.
2
Select
Devices
>
Manage
tab.
3
Select the controller in the list on the page and click
Upload
.
4
If you are adding a new control program, click
. A dialog window appears.
5
Enter a name for your control program in
Display Name
and select your controller in the
Controller
drop-down
list.
NOTES
○
If you already have the maximum number of control programs for a controller, it will not appear in the
list.
○
Optional: You can change the control program's
Reference Name
if needed.
6
Do one of the following:
If the control program is...
In the
Control Program
drop-down
list
Select the control program.
Not in the
Control Program
drop-
down list
a. Click
Add New
.
b. Browse to select the control program.
c. Click
Open
.
d. Click
Continue
.
e. Click Close.
Installing the Zone Ctrl II and VAV Zone II Secondary Duct into the i-Vu®