GB - 4
NTC Room Controller 2
Mounting
waRNING:
Before installing the Room Controller 2, turn off all power to the
Unit that will supply power to the Room Controller 2. Electrical
shock can cause personal injury or death.
It is not possible to connect more than one user’s interface to each
single machine. For the correct operation of Room Controller 2
disconnect the lED card if fitted.
Turn oFF all power to unit.
•
Installation
Mounting screws
To indoor unit
Rigid PVC conduit inside
ø 30mm min.
Plaster approx
30 mm
Room Controller 2
Connector block
Connection cable
Connection cable
G
P
C
I
G
P
C
I
I
G
P
C
I
Push any excess wire into the wall and against mounting base.
•
If the air sensor is being used on the Room Controller 2, seal hole in wall
to prevent air leaks.
Leaks can affect sensor operation.
Push the Room Controller 2 snap hinge to the base.
•
Match and connect equipment wires to proper terminals in the
•
connector block.
Both power and communication wires must be connected correctly for
proper Room Controller operation.
Open the Room Controller 2 rear mounting base to expose mounting
•
holes.
The base can be removed to simplify mounting (snap apart carefully
at hinge to separate mounting base from remainder of the Room
Controller 2).
Route the Room Controller 2 wires through the large hole in the
•
mounting base.
Level mounting base against wall (for aesthetic value only the Room
Controller 2 need not be level for proper operation) and mark the wall
through the 2 mounting holes.
Drill two 5 mm mounting holes in wall where marked.
•
Secure mounting base correctly (
•
) to wall with 2 screws and
anchors provided, (additional anchoring holes available for more
secure mounting if needed) making sure all wires extend through hole
in mounting base.
Adjust length and routing of each wire to reach the proper terminal in
•
the connector block on the mounting base, with 6 mm of extra wire
(strip only 6 mm of insulation from each wire to prevent adjacent wires
from shorting together when connected).