10
3 - DIMENSIONS, CLEARANCES
3.1 - 30XB-250 to 350, 30XBP-250 to 350, 30XB-250 to 300 with option 254/255
1
2
1
1
POWER AND
CONTROL
ELECTRICAL
BOX
2297 HT
3604 HT
2253 HT
1500
1500
2200
1500
500
1
3.2 - 30XB-400 to 450, 30XBP-400 to 500, 30XB-350 to 400 with option 254/255
POWER AND CONTROL
ELECTRICAL BOX
2297 HT
4798 HT
2253 HT
1500
500
2200
1500
1500
1
1
2
1
1
Legend
NOTES:
-
Drawings are not contractually binding.
-
Before designing an installation, consult the certified
dimensional drawings, available on request.
-
For the positioning of the fixing points, weight distribution
and centre of gravity coordinates please refer to the
dimensional drawings.
-
If the installation includes several units or if this (these)
is (are) close to walls, please refer to chapters 3.12 -
“Multiple chiller installation” and 3.13 - “Distance to the
wall” of this document to determine the space required.
All dimensions are given in mm.
a
Required clearances for maintenance (see note)
b
Recommended space for evaporator tube removal
Water inlet for standard unit
For options 5, 6, 100A, 100C, 107 refer to the certified drawing.
Water inlet for standard unit
For options 5, 6, 100A, 100C, 107 refer to the certified drawing.
Air outlet – do not obstruct
Power supply and control connection
Summary of Contents for AquaForce 30XB series
Page 69: ......