COMMENTS:
TESTING
YES/NO
DATE TO BE
COMPLETED
1. The cooling tower fan has been checked for blade pitch and
proper operation.
2. The chilled water and condenser water lines have been:
a. Filled
b. Tested
c. Flushed
d. Vented
e. Strainers cleaned
3. The chilled water and condenser water pumps have been
checked for proper rotation and flow.
4. The following cooling load will be available for start-up:
a. 25%
b. 50%
c. 75%
d. 100%
5. The refrigerant charge is at the machine.
6. Services such as electrical power and control air will be available
at start-up.
7. The electrical and mechanical representatives will be available
to assist in commissioning the machine.
8. Power will be applied to unit 24 hours prior to commissioning
to allow oil heater to energize and heat up oil.
9. The customer’s operators will be available to receive instructions
for proper operation of the chiller after start-up.
Concerns about the installation/request for additional assistance:
I am aware that the start-up time for a Carrier chiller can take between 2 and 6 days depending on the model of the machine and the
options and accessories used with it.
Your contact at the job site will be . . . . . . . . . . . . . . . . . . . . . .
Phone number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cell/Pager number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fax number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In accordance with our contract, we hereby request the services of your technician to render start-up services per contract terms for this
job on
(Date). I understand that the technician’s time will be charged as extra services due to correcting items in this
checklist that are incomplete.
Signature of Purchaser ________________________________________________________________________________________
Signature of Job Site Supervisor ________________________________________________________________________________
Summary of Contents for AquaEdge 23XRV
Page 53: ...53 Fig 58 23XRV Controls Schematic ...
Page 54: ...54 Fig 58 23XRV Controls Schematic cont FROM 2000767952 SHEET 3 ...
Page 55: ...55 Fig 58 23XRV Controls Schematic cont ...
Page 56: ...56 Fig 59 23XRV Controls Schematic Rockwell Standard Tier VFD Shown ...
Page 57: ...57 Fig 60 23XRV LF2 VFD Wiring Diagram ...
Page 65: ...65 Fig 70 23XRV Insulation Area Units with P Compressor ...