![Carrier Aero 39MN Series Installation, Start-Up And Service Instructions Manual Download Page 271](http://html1.mh-extra.com/html/carrier/aero-39mn-series/aero-39mn-series_installation-start-up-and-service-instructions-manual_2562126271.webp)
CL-5
START-UP CHECKLIST — CARRIER 39M GAS-FIRED DUCT FURNACE
I. PRELIMINARY INFORMATION
FURNACE SERIAL NO(S) __________________________________________________
CARRIER MODEL NO._____________________________________________________
SERIAL NO. _____________________________________________________________
START-UP DATE _________________________________________________________
START-UP CONTRACTOR _________________________________________________
TECHNICIAN NAME ______________________________________________________
PHONE ________________________________________________________________
TYPE OF GAS ___________________________________________________________
GAS PRESSURE AT INLET (BURNERS OFF)_____________________________________________________________ in. wg
SUPPLY VOLTAGE AT JUNCTION BOX __________________________________________________________________ vac
II. OPERATING SET-UP
III. OPERATION CHECKLIST
All gas lines and connections checked for leaks (Pg 184)
(Y/N) _____
Adequate combustion air (Pg 181)
(Y/N) _____
Condensate drain lines installed (Pg 181)
(Y/N) _____
Any system deficiencies noted
(Y/N) _____
DESCRIBE:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
SIGNATURE:
_______________________________________________________
DATE:
_______________________________
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec
-
tions of this Installation Instruction document.
SINGLE UNIT
2 UNITS IN SERIES
—
SECONDARY HEATER
OPERATING SET-UP DATA
LOW FIRE (0V DC)
HIGH FIRE (10V DC)
HIGH FIRE (10V DC)
Gas Press. at Train Inlet
___________in. wg
___________in. wg
___________in. wg
Gas Press. at Burner Manifold
___________in. wg
___________in. wg
___________in. wg
Gas Input Rate
____________Btuh
____________Btuh
____________Btuh
CO
2
in Flue Gas
_______________%
_______________%
_______________%
CO in Flue Gas
_____________ppm
_____________ppm
_____________ppm
Flue Gas Temp at Discharge
______________°F
______________°F
______________°F
Temperature Rise
______________°F
______________°F
______________°F