START-UP CHECKLIST — 39MN INDOOR AHU UNITS
I. PRELIMINARY INFORMATION
MODEL NO.JOB NAME_________________________
SERIAL NO. ADDRESS ________________________
START-UP DATE______________________________
TECHNICIAN NAME ___________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
SINGLE POINT POWER OPTION
Are power connections to the Single Point Power Enclosure made and checked?
(Y/N) _____
Are all power harness connections made at unit splits?
(Y/N) _____
Are all wiring terminals tight?
(Y/N) _____
CONTROLS
Are thermostat(s) and indoor fan control wiring connections made and checked?
(Y/N) _____
Are all wiring terminals tight? (including power to fan motors, heaters, etc.) (Pg 141)
(Y/N) _____
AIR HANDLER
Remove packaging and any construction debris.
(Y/N) _____
Inspect for shipping and/or handling damage, make claims as required. (Pg 84)
(Y/N) _____
Inspect all panel flanges for damage. Panel flanges should be smooth with no sharp bends.
(Y/N) _____
Are all corner connectors and frame to channel joints smooth with no cracks, large bumps
or depressions in the caulk?
(Y/N) _____
Are any door latches loose or damaged? If so, tighten or replace.
(Y/N) _____
Release fan holddown bolts. (Pg 85, Fig. 18)
(Y/N) _____
Check fan bearings and shaft(s) for tightness. (Pg 198)
(Y/N) _____
Hand turn fan to ensure no rubbing with housing.
(Y/N) _____
Have fan and motor pulleys been checked for proper alignment? (Pg 111)
(Y/N) _____
Do the fan belts have proper tension? (Pg 112)
(Y/N) _____
Are proper air filters in place? (Pg 212-254)
(Y/N) _____
Are all wiring terminals to fan motors and heaters tight? (Pg 110)
(Y/N) _____
Has water been placed in drain pan to confirm proper drainage?
(Y/N) _____
Is duct connected to unit? (Pg 90)
(Y/N) _____
Verify wiring is correct for application (voltage, etc.) per component label.
(Y/N) _____
Are field wiring penetrations into 39M properly sealed for air and water leaks (includes conduit inside box)?
(Y/N) _____
PIPING
Have leak checks been made at chillers, boilers, valves, and indoor coils?
(Y/N) _____
Has air been bled from system?
(Y/N) _____
Is freeze protection provided (if required)? (Pg 129)
(Y/N) _____
For DX system, has system been charged with refrigerant? (Pg 130)
(Y/N) _____
Locate, repair, and report any leaks.
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec
-
tions of this Installation Instruction document.