![Carrier 538FEQ009RBGA Service Manual Download Page 57](http://html1.mh-extra.com/html/carrier/538feq009rbga/538feq009rbga_service-manual_2561763057.webp)
57
9. Remove motor and motor support
8. Remove electric reactor
7. Remove electric box assy
Remove screws fixing electric box assy and
mid-isolation board, loosen the bonding tie, pull off the
wiring terminal, lift to remove the electric box assy.
Remove the four tapping screws fixing motor, pull out
the contact tag of motor wiring, to remove the motor.
Remove the two tapping screws fixing motor support
and chassis, lift to remove the motor support.
Remove the screws fixing electric reactor, to remove
the electric reactor.
electric box assy
electric box cover
electric
reactor
motor support
motor
Summary of Contents for 538FEQ009RBGA
Page 6: ...6 DIMENSIONS OUTDOOR Fig 3 Dimensions Fig 4 Dimensions Fig 5 Dimensions Fig 6 Dimensions...
Page 10: ...10 Outdoor Unit Fig 11 Sizes 09 12...
Page 47: ...47 Shut off power hold both ends of horizontal...
Page 48: ...48...
Page 49: ...49...
Page 50: ...50 ziptie side cutters...
Page 51: ...51...
Page 52: ...52...
Page 53: ...53...
Page 54: ...54...
Page 67: ...67 6 7 8...
Page 68: ...68 9 Remove electric box 10 Remove evaporator...
Page 69: ...69...
Page 70: ...70 11 Remove swing blade...
Page 71: ...71 12 Remove cross flow blade and motor...
Page 72: ...72 13 Remove drive box...
Page 84: ...84 APPENDIX Appendix 1 Reference Sheet of Celsius and Fahrenheit...
Page 89: ...89 UNIT BREAKDOWNS a b c d e...
Page 90: ...90 f g h...
Page 91: ...91...
Page 92: ...92...
Page 93: ...93...