Use Fig. 47 and Table 7 to set the DIP switches for the de-
sired use of the sensor.
NOTE: When an S-Bus sensor is connected to an existing net-
work, it will take 60 minutes for the network to recognize and
auto-configure itself to use the new sensor.
During the 60-minute setup period, no alarms for sensor fail-
ures (except SAT) will be issued and no economizing func-
tion will be available.
CO
2
Sensor Wiring
When using a CO
2
sensor the black and brown common wires
are internally connected and only one is connected to “IAQ
COM” on the W7220. Use the power from the W7220 to
power the CO
2
sensor OR make sure the ground for the pow-
er supplies are common. See Fig. 48 for CO
2
sensor wiring.
Fig. 48 — CO
2
Sensor Wiring
Interface Overview
This section describes how to use the EconoMi$er
®
user in-
terface for:
• Keypad and menu navigation
• Settings and parameter changes
• Menu structure and selection
User Interface
The user interface consists of a 2-line LCD display and a 4-
button keypad on the front of the economizer controller.
Keypad
Use the four navigation buttons (see Fig. 49) to scroll through
the menus and menu items, select menu items, and to change
parameter and configuration settings.
To use the keypad when working with menus:
• Press the
▲
(Up arrow) button to move to the previous
menu.
• Press the
▼
(Down arrow) button to move to the next
menu.
• Press the
(Enter) button to display the first item in
the currently displayed menu.
Fig. 49 — W7220 Controller Navigation Buttons
Press the
(Menu Up/Exit) button to exit a menu’s item
and return to the list of menus. To use the keypad when work-
ing with Setpoints, System and Advanced Settings, Checkout
tests and Alarms:
1. Navigate to the desired menu.
2. Press the
(Enter) button to display the first item in
the currently displayed menu.
3. Use the
▲
and
▼
buttons to scroll to the desired
parameter.
4. Press the
(Enter) button to display the value of the
currently displayed item.
5. Press the
▲
button to increase (change) the displayed
parameter value.
6. Press the
▼
button to decrease (change) the displayed
parameter value.
NOTE: When values are displayed, pressing and holding the
▲
or
▼
button causes the display to automatically increment or
decrement.
1. Press the
(Enter) button to accept the displayed value
and store it in nonvolatile RAM. “CHANGE STORED”
displays.
2. Press the
(Enter) button to return to the current menu
parameter.
3. Press the
(Menu Up/Exit) button to return to the pre-
vious menu.
Menu Structure
Table 8 illustrates the complete hierarchy of menus and pa-
rameters for the EconoMi$er
®
X system.
The Menus in display order are:
• STATUS
• SETPOINTS
• SYSTEM SETUP
• ADVANCED SETUP
• CHECKOUT
• ALARMS
Table 6 — HH57AC081 Sensor Wiring
Terminations
TERMINAL
TYPE
DESCRIPTION
NUMBER
LABEL
1
S-BUS
S-BUS
S-BUS
Communications
(Enthalpy Control
Sensor Bus)
2
S-BUS
S-BUS
S-BUS
Communications
(Enthalpy Control
Sensor Bus)
Table 7 — HH57AC081 Sensor DIP Switch
USE
DIP SWITCH POSITIONS FOR SWITCHES 1, 2, AND 3
1
2
3
DA
OFF
ON
OFF
RA
ON
OFF
OFF
OA
OFF
OFF
OFF
CO
2
SENSOR
24V
ANALOG
OUT
L1
(HOT)
L2
RED
BLACK
YELLOW
BROWN
ORANGE
GREEN
+
–
POWER SUPPLY. PROVIDE DISCONNECT
MEANS AND OVERLOAD PROTECTION
AS REQUIRED.
1
1
Summary of Contents for 50KC*A/B0 Series
Page 4: ...4 Fig 2 Dimensional Drawing...
Page 5: ...5 Fig 2 Unit Dimensional Drawing cont...
Page 22: ...22 Fig 38 Electro Mechanical Control Wiring Diagram...
Page 23: ...23 Fig 39 Electro Mechanical Control Wiring Diagram with Humidi MiZer System...
Page 24: ...24 Fig 40 Electro Mechanical Power Wiring...
Page 25: ...25 Fig 41 PremierLink Wiring Schematic...
Page 26: ...26 Fig 42 PremierLink Wiring Schematic with Humidi MiZer System...
Page 27: ...27 Fig 43 RTU Open System Control Wiring Diagram...
Page 28: ...28 Fig 44 RTU Open System Control Wiring Diagram with Humidi MiZer System...
Page 43: ...43 Fig 57 TXV Metering Device Position in Reheat Coil Typical Diagram for Sizes 04 06 TXV...
Page 44: ......
Page 45: ......