50
12 - FACTORY OPTIONS AND ACCESSORIES
Boiler layout
1
2
3
4
5
6
7
8
9
21
19
20
22
23
15
14
11
10
12
13
16
18
17
ON
ON
ON
CO
CO
C
C
O
O
ON
ON
IIII
FID
FID
FFFID
FID
FID
FID
FID
FID
FID
D
D
C
C
N
N
7
7
1
Flue gas analysis outlet
2
Flue gas exhaust connection
3
Gas valve
4
Fan
5
Combustion chamber
6
Electrical cabinet
7
Flue non-return valve
8
Drain cock
9
Minimum pressure switch
10
Main switch
11
Return from the hydraulic circuit
of the hot water coil
12
Gas supply
13
Discharge to the hydraulic circuit
14
Condensate drain connection
15
Flow-meter
16
Exhaust
fl
ue probe
17
Return probe
18
Control panel
19
Ignition/detection electrode
20
Safety thermostat
21
Flow probe
22
Automatic bleed valve
23
Casing
Installation of the boiler
The boiler is supplied disassembled with the 50FF/FC unit, for
installation on site.
The hydraulic circuit is assembled inside the 50FF/FC unit. The
installer must connect the connecting piping with the boiler.
Note: all this piping system is sent packed together with the boiler.
1
Pump
Expansion vessel
Safety valve
Automatic
bleed valve
2
3
4
5
Step 1: Remove the panel (1) secured using M6 Allen screws to
facilitate the work. Next, connect the piping:
(2) Discharge to the hydraulic circuit of the hot water coil
(3) Drain connection of the safety valve
(4) Filling line
(5) Return from the hydraulic circuit of the hot water coil
Summary of Contents for 50FC 020-099
Page 78: ...78 Notes ...