START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION
MODEL NO.:
DATE:
SERIAL NO.:
TECHNICIAN:
II. PRE-START-UP (insert checkmark in box as each item is completed)
M
VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
M
REMOVE SHIPPING TIE DOWN BANDS ON COMPRESSOR (SIZE 014 ONLY) PER INSTALLATION
INSTRUCTIONS
M
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
M
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
M
CHECK GAS PIPING FOR LEAKS
M
CHECK THAT INDOOR-AIR FILTERS ARE CLEAN AND IN PLACE
M
VERIFY THAT UNIT INSTALLATION IS LEVEL
M
CHECK FAN WHEELS AND PROPELLERS FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
L1-L2
L2-L3
L3-L1
COMPRESSOR AMPS
L1
L2
L3
COMPRESSOR AMPS
L1
L2
L3
INDOOR-FAN AMPS
L1
L2
L3
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
DB
RETURN-AIR TEMPERATURE
DB
WB
COOLING SUPPLY AIR
DB
GAS HEAT SUPPLY AIR
DB
PRESSURES
GAS INLET PRESSURE
IN. WG
GAS MANIFOLD PRESSURE
IN. WG (HI FIRE)
REFRIGERANT SUCTION
PSIG — CIRCUIT NO. 1
PSIG — CIRCUIT NO. 2
REFRIGERANT DISCHARGE
PSIG — CIRCUIT NO. 1
PSIG — CIRCUIT NO. 2
M
VERIFY REFRIGERANT CHARGE USING CHARGING TABLES
M
VERIFY THAT 3-PHASE SCROLL COMPRESSOR ROTATING IN CORRECT DIRECTION (48TJ014 ONLY)
----------------------------------------------------------------------------------------
CUT
ALONG
DOTTED
LINE
CUT
ALONG
DOTTED
LINE
Copyright 1996 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1
4
Tab
1a 6a
PC 111
Catalog No. 564-934
Printed in U.S.A.
Form 48TJ-13SI
Pg CL-1
9-96