
4
•
To prevent damage during movement or transportation, do not remove the units from their
packaging until they arrive at the final installation location.
•
Prevent ropes, chains or other equipment from leaning on the units.
•
Respect the stacking limits indicated on the packaging of the units.
•
Do not swing the outdoor unit during transportation or tilt it at more than 15
o
to the vertical
plane.
•
To retain the guarantee, prevent the units from being exposed to possible work accidents,
and arrange for their immediate transfer to the place of installation or another safe location.
•
When unpacking the units and removing the protective expanded polystyrene (isopor)
packaging, do not throw away this polystyrene immediately, because they may be used as
protection against dust or other harmful agents until the work and/ or installation is complete
and the system is ready to be brought into operation.
3
RECEIVING AND INSPECTING THE UNITS
ATTENTION !!!
Never hang or load the indoor unit by the plastic sides.
Secure it to the metal parts as shown in Figure 2.
Fig. 2 - Handling the indoor unit