![background image](http://html.mh-extra.com/html/carrier/39ccn/39ccn_installation-start-up-and-service-instructions-manual_2562105011.webp)
11
SIGNATURE: ___________________________________________________
DATE: _______________________________________
ELIMINATORS AND DAMPERS
_____
Equipment has been visually inspected for damage;
damaged blades/linkage repaired.
_____
Check that low-leak damper edge and blade seals are in
place and not loose.
_____
Manually operate each damper through cycle to verify
operation and complete closure.
_____
Actuators are installed.
_____
Actuators have been hand-operated through cycle to
ensure there is no over-torquing.
_____
Actuators have been power-operated through cycle to
verify operation.
GENERAL
_____
Entire cabinet has been visually checked and repairs
made if necessary.
_____
Access doors have been checked for free movement
and complete closure.
_____
All seams are sealed.
_____
Verify that there are no air leaks with running fan.
_____
Check interior of unit for loose or damaged insulation
and make repairs if necessary.
AFTER FAN START-UP: After 8 hours and 48 hours of fan
operation, shut down fan, lockout power, and check the
following:
_____
Thrust restraints
_____
Set screws and hold downs
_____
Drive coupling alignments
_____
Belt drive
_____
Bearing housing temperature