![Carrier 38NYV050M Series Service Manual Download Page 51](http://html1.mh-extra.com/html/carrier/38nyv050m-series/38nyv050m-series_service-manual_2560737051.webp)
–
50
–
CAUTION
•
Be sure to refer to the wiring system diagram
labeled inside the front panel.
•
Check local electrical regulations for any
specific wiring instructions or limitations.
10-3-5. Piping and Drain Hose Installation
Piping and drain hose forming
•
Since condensation results in machine trouble,
make sure to insulate both the connecting pipes
separately.
(Use polyethylene foam as insulating material.)
Fig. 10-3-8
1. Die-cutting front panel slit
Cut out the slit on the left or right side of the front
panel for the left or right connection and the slit
on the bottom left or side of thefront panel for the
bottom left or right connection with a pair of
nippers.
2. Changing drain hose
For left connection, left-bottom connection and
rear-left connection
’
s piping, it is necessary to
relocate the drain hose and drain cap.
CAUTION
Earth line
10 mm
10 mm
50 mm
110 mm
How to remove the drain cap
Clip drain cap with needle-nose pliers, and pull out.
Fig. 10-3-9
How to remove the drain hose
The drain hose is secured in place by a screw.
Remove the screw securing the drain hose, then pull
out the drain hose.
Die-cutting Front panel slit
Changing drain hose
Piping preparation
Rear right
Rear left
Bottom left
Left
Bottom right
Right
20 mm
10 mm
80 mm
110 mm
1
2
3
Cord clamp
Terminal block
Terminal cover
Screw
Earth line
Screw
Connecting cable
Earth line
Connecting cable
Stripping length of the connecting cable
about
15 cm
NOTE :
WIRE TYPE : more than 1.0mm
2
. (H07 RN-F
or 60245 IEC 66).
Fig. 10-3-6
Heat insulator
Drain hose
Fig. 10-3-10
Fig. 10-3-7