![Carrier 30RBM 160 Installation, Operation And Maintenance Instructions Download Page 71](http://html1.mh-extra.com/html/carrier/30rbm-160/30rbm-160_installation-operation-and-maintenance-instructions_2562324071.webp)
71
14 - FINAL SHUTDOWN
14.1 - Shutting down
Separate the units from their energy sources, allow them to cool then drain them completely.
14.2 - Recommendations for disassembly
Use the original lifting equipment.
Sort the components according to their material for recycling or disposal, in accordance with regulations in force.
Check whether any part of the unit can be recycled for another purpose.
14.3 - Fluids to be recovered for treatment
•
Refrigerant
•
Heat-transfer fluid: depending on the installation, water, brine solution, etc.
•
Compressor oil
14.4 - Materials to be recovered for recycling
•
Steel
•
Copper
•
Aluminium
•
Plastics
•
Polyurethane foam (insulation)
14.5 - Waste Electrical and Electronic Equipment (WEEE)
At the end of its life, this equipment must be disassembled and contaminated fluids removed by professionals and processed
via approved channels for electrical and electronic equipment (WEEE).
Summary of Contents for 30RBM 160
Page 75: ......