![Carrier 19EF Series Start Up & Operation Manual Download Page 16](http://html1.mh-extra.com/html/carrier/19ef-series/19ef-series_start-up-and-operation-manual_2562257016.webp)
3. Press RELEASE to remove the override and return the
point to the PIC’s automatic control.
Override Indication — An override value is indicated by
‘‘SUPVSR,’’ ‘‘SERVC,’’ or ‘‘BEST’’ flashing next to the point
value on the Status table.
TO VIEW OR CHANGE TIME SCHEDULE OPERATION
(Fig. 15)
1. On the Menu screen, press SCHEDULE .
2. Press NEXT or PREVIOUS to highlight one of the
following schedules.
OCCPC01S — LOCAL Time Schedule
OCCPC02S — ICE BUILD Time Schedule
OCCPC03-99S — CCN Time Schedule (Actual
number is defined in Config table.)
3. Press SELECT to access and view the time schedule.
4. Press NEXT or PREVIOUS to highlight the de-
sired period or override that you wish to change.
5. Press SELECT to access the highlighted period or
override.
6. a. Press INCREASE or DECREASE to change the
time values. Override values are in one-hour incre-
ments, up to 4 hours.
b. Press ENABLE to select days in the day-of-week
fields. Press DISABLE to eliminate days from the
period.
7. Press ENTER to register the values and to move
horizontally (left to right) within a period.
8. Press EXIT to leave the period or override.
9. Either return to Step 4 to select another period or
override, or press
EXIT
again to leave the cur-
rent time schedule screen and save the changes.
10. Holiday Designation (HOLIDEF table) may be found in
the Service Operation section, page 33. You must assign
the month, day, and duration for the holiday. The Broad-
cast function in the Brodefs table also must be enabled
for holiday periods to function.
TO VIEW AND CHANGE SET POINTS (Fig. 16)
1. To view the Set Point table, at the Menu screen press
SETPOINT .
Fig. 15 — Example of Time Schedule
Operation Screen
Fig. 16 — Example of Set Point Screen
16
Summary of Contents for 19EF Series
Page 10: ...Fig 5 19EF Controls and Sensor Locations cont 10...
Page 13: ...Fig 12 19EF Menu Structure 13...
Page 14: ...Fig 13 19EF Service Menu Structure 14...
Page 38: ...Fig 24 19EF Leak Test Procedures 38...
Page 69: ...Fig 36 Electronic PIC Controls Wiring Schematic 69...
Page 70: ...Fig 36 Electronic PIC Controls Wiring Schematic cont 70...
Page 71: ...Fig 37 Machine Power Panel Starter Assembly and Motor Wiring Schematic 71...