Replacement Aluminized Primary Heat Exchanger: Installation Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
9
A11442
Fig. 7 – Collector Box Gasket Condensate Trap
A11438
Fig. 8 – Heat Exchanger Panel Assembly
REMOVE OLD GASKET
APPLY NEW GASKET TO COLLEC-
TOR BOX BEFORE RE-INSTALLING
CONDENSATE TRAP
CONDENSATE TRAP