background image

Replacement Aluminized Primary Heat Exchanger: Installation Instructions

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

5

3. Repeat the procedure for the opposite side baffle.
4. Remove the screws around each burner inlet opening that attaches

the  heat  exchanger  cell  panel  to  the  primary  inlet  plate  of  the

primary heat exchanger assembly.

5. If not removed already, remove the screws that attach the primary

cell panel to the front of condensing heat exchanger section.

6. Separate the  Primary Heat  Exchanger  from the  Condensing  Heat

Exchanger.

7. Remove the primary cell panel from the primary cell inlet plate and

set aside.

BEGIN RE-ASSEMBLY

Install Heat Exchanger Primary Cell Panel

1. Align  the  primary  cell  panel  with  the  primary  inlet  plate  of  heat

exchanger assembly.

2. Avoid damaging the cell panel insulation during alignment.
3. Insert the screws around each burner inlet opening that attaches the

heat exchanger cell panel to the primary inlet plate of the primary

heat exchanger assembly, see 

Fig. 6

.

Attaching Primary and Condensing Heat 

Exchangers

1. Align the bottom edge primary cell outlet panel with the top edge of

the condensing heat exchanger assembly, and align the top edge of

the condensing heat exchanger outlet panel with the bottom edge of

the primary cell inlet panel.

2. The orange  foam  gasket  must be  between  the  primary  cell outlet

panel and the containment plate that is attached to the condensing

heat  exchanger.  The  white  fiber  gasket  or  equivalent  must  be

between  the  primary  cell  inlet  panel  and  the  condensing  heat

exchanger outlet panel, see 

Fig. 6

.

3. Insert  all  the  screws,  except  the  outboard  screws  in  the  primary

outlet  panel,  to  secure  the  primary  heat  exchanger  panels  to  the

condensing heat exchanger panels (front and back), see 

Fig. 6

.

Install Coupling Box Cover/Finger Baffles

1. Apply a 1/4” bead of low adhesion silicone (white) to the coupling

box cover in the pattern shown in 

Fig. 9

.

2. Align the Coupling Box Cover over the rear of the Heat Exchanger

Assembly, see 

Fig. 6

 and 

Fig. 5

.

3. Install  the  screws  that  secure  the  bottom  edge  and  sides  of  the

Coupling Box to the Heat Exchanger Assembly.

4. Align the Finger Baffles along the top edge of the Coupling Box

Cover, see 

Fig. 6

.

5. Install the screws for the Finger Baffles and the remaining screws

for the top edge of the Coupling Box Cover.

Install Sidewall Baffles

1. Avoid damaging the cell panel insulation by inserting the sidewall

baffle inward from the rear of coupling box to the indexing tab on

the primary cell panel then align the baffle with the coupling box

cover. 

Insert the slot on the sidewall baffle over the tab on the primary cell

panel, see 

Fig. 5

.

NOTE: 

The front edge of the sidewall baffle has a slot that engages a tab

on the primary cell panel.

2. Insert the screws that attach the sidewall baffle to the primary cell

panel.

3. Align  the  rear  edge  of  the  baffle  with  the  screw  holes  in  the

coupling box cover.

A11414

Fig. 5 – Coupling Box/Sidewall Baffle Removal / Installation - Rear 

View

4. Insert  the  screws  that  attach  the  sidewall  baffles  to  the  coupling

box.

Heat Exchanger Assembly Installation

1. Lift the heat exchanger assembly and set the rear of the assembly on

the blower deck.

2. Slide  the  heat  exchanger  onto  the  support  rails  in  the  furnace

casing.

3. Raise  the  rear  of  the  heat  exchanger  and  set  the  bottom  of  the

sidewall baffles on top of the support rails in the blower deck.

4. Slide the heat exchanger assembly into the casing, making sure the

bottom edge of the sidewall baffle slides into the engagement tab on

the support rails. 

NOTE: 

Be sure cell panel insulation is folded over the top flange of the

primary cell inlet panel so that when the heat exchanger is fully installed,

the insulation seals between the top plate and the top flange of the cell

panel. 

NOTE: 

Be sure the cell panel insulation is visible on both sides of the

heat  exchanger  cell  panel  so  that  when  the  heat  exchanger  is  fully

installed, the insulation seals between the cell panel and the mounting

brackets. If any insulation is not visible, pull the heat exchanger forward,

adjust the insulation and reinstall so that the cell panel is properly sealed

to the top plate and to the mounting brackets.

5. Continue to slide the heat exchanger assembly backward into the

casing  until  the  primary  cell  panel  is  flush  with  the  mounting

brackets on the side of the casing.

6. Align the primary cell panel with the mounting brackets.
7. Insert  the  screws  that  attach  the  primary  cell  panel  to  mounting

brackets on the casing.

8. Align  the  filler  plate  to  the  bottom  edge  of  the  condensing  heat

exchanger assembly.

9. Secure the filler plate to the condensing heat exchanger and casing.

Collector Box Installation

1. Verify old collector box gasket is reusable or obtain a new gasket

from the distributor (preferred).

2. Obtain new condensate trap gasket from distributor and install.

NOTE: 

There is a slot on each side of the front panel of the condensing

heat exchanger. The collector box has alignment tabs on the back that fit

into the slots on the condensing heat exchanger panel.

Summary of Contents for 1184802

Page 1: ...r Kit Part No 1186215 1186216 1186217 1186218 1186219 1186220 1184802 and 1184803 in 35 in 889 mm tall condensing gas furnaces see Table 2 for model sizes The low adhesion sealant used on the Coupling...

Page 2: ...Removal NOTE Use a back up wrench on the gas valve to prevent the valve from rotating on the manifold or damaging the mounting to the burner box s see Fig 2 1 Disconnect the gas pipe from gas valve an...

Page 3: ...screws from the tabs on inducer assembly that secures the inducer to the collector box Note there is one mounting tab directly under the vent elbow 5 Remove the inducer assembly and set aside 6 To av...

Page 4: ...Baffles to the Primary Cell Panel and set aside Separate Primary and Condensing Heat Exchangers 1 Remove the screws that attach the condensing heat exchanger assembly to the primary cell outlet panel...

Page 5: ...ion by inserting the sidewall baffle inward from the rear of coupling box to the indexing tab on the primary cell panel then align the baffle with the coupling box cover Insert the slot on the sidewal...

Page 6: ...two types of pressure switches The modulating pressure switch assembly has three pressure switches Two are side by side with the third switch mounted to the back of one of the switches All other furn...

Page 7: ...t anticipator setting dirty filter or over sized furnace Under firing low Btu input Set manifold pressure and verify firing rate as shown on rating plate by clocking the gas meter Over firing high Btu...

Page 8: ...ns Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations 8 A160110 Fig 6 Heat Exchanger Removal Installation CELL PANEL 5217 9 2 35 0...

Page 9: ...e right to change at any time specifications and designs without notice and without obligations 9 A11442 Fig 7 Collector Box Gasket Condensate Trap A11438 Fig 8 Heat Exchanger Panel Assembly REMOVE OL...

Page 10: ...443 06 5311 04 Replaces 443 06 5311 03 Replacement Aluminized Primary Heat Exchanger Installation Instructions Manufacturer reserves the right to change at any time specifications and designs without...

Reviews: