1-7-5. If tolerance are not met, shim the appropriation points by inserting a metal shim between
the frame and foundation.
Metal shim size is approximately 50mm width and 80mm length. Prepare the shim of some
different thickness (0.6mm to 9mm).
1-7-6. Fix the anchor bolts
a) Weld the washers on the chiller's frame.
b) Tight up the nuts.
11
Summary of Contents for LJ
Page 1: ...Absorption Chiller INSTALLATION MANUAL LJ Model ...
Page 26: ...Fig 1 11 7 23 ...
Page 30: ... marks are the positions measured by the megger 27 ...
Page 36: ...33 ...
Page 37: ...34 ...
Page 46: ...13 Sampling of absorbent Sampling of absorbent Finished Unfinished 43 ...