Chapter 2 Quick Guide
This chapter is intended to help you grasp the basic operations of the
C
UMG gateway in
the shortest time.
Step 1: Confirm that your packing box contains all the following things.
z
C
UMG Gateway *1
z
Angle Bracket *2, Rubber Foot Pad *4, Screw for Angle Bracket *8
z
220V Power Cord *2
z
Warranty Card *1
z
Installation Manual *1
Step 2: Properly fix the
C
UMG gateway.
If you do not need to place the gateway on the rack, simply fix the 4 rubber foot pads. Otherwise,
you should first fix the 2 angle brackets onto the chassis and then place the chassis on the rack.
Step 3: Connect the power cord.
Make sure the device is well grounded before you connect the power cord. Check if the power
socket has the ground wire.
Note:
Each
C
UMG gateway has two power interfaces to meet the requirement for power supply
hot backup. As long as you properly connect and turn on these two power keys, either power
supply can guarantee the normal operation of the gateway even if the other fails.
Step 4: Connect the network cable.
Step 5: Log in the gateway.
Enter the original IP address (LAN 1: 192.168.1.101 or LAN 2: 192.168.0.101) of the
C
UMG
gateway in the browser to go to the WEB interface. The original username and password of the
gateway are both ‘admin’. For detailed instructions about login, refer to
. We
suggest you change the initial username and password via ‘System Tools
Æ
Change Password’
on the WEB interface as soon as possible after your first login. For detailed instructions about
changing the password, refer to
. After changing the password, you are
required to log in again.
Step 6: Modify IP address of the gateway.
You can modify the IP address of the gateway via ‘System Tools
Æ
Network’ on the WEB interface
to put it within your company’s LAN. Refer to
for detailed instructions about IP
modification. After changing the IP address, you shall log in the gateway again using your new IP
address.
Step 7: Check the connection of subboards.
After the gateway starts successfully with the subboards, you can go ‘Gateway
Æ
Subboard
Gateway’ on the WEB interface to check if all the subboards are well connected.
Step 8: Set routing rules for calls.
Go to the route setting interface of each subboard to set the routing rules. Please refer to the user
manual of each gateway for detailed information.
Special Instructions:
z
The chassis of the
C
UMG gateway must be grounded for safety reasons, according to
standard industry requirements. A simple way is earthing with the third pin on the plug.
C
UMG Gateway User Manual (Version 1.6.3)
Page 7