BT2 Quick start operational guide
P a g e |
9
5 Deployment
Now you are connected and ready to survey.
Deploy the probe so the tip of the nose cone is 2m past the collar.
Check you are set to survey the
correct
Hole
(01) and the
correct
Segment length
(2m).
First nodule on cable
Probe lowered until
second nodule is level
with the hole collar.